5.3 Operating procedure for connecting the standard
5.3 Operating procedure for connecting the standard
model or the long backup time model
model or the long backup time model UPS (“S
UPS (“S’’ model)
’’ model)
with the external battery
with the external battery
1. The nominal DC voltage of external battery pack is 240VDC. Each
1. The nominal DC voltage of external battery pack is 240VDC. Each
battery pack consists of 20 pieces of 12V maintenance free
battery pack consists of 20 pieces of 12V maintenance free
batteries in series. To achieve longer backup time, it is possible to
batteries in series. To achieve longer backup time, it is possible to
connect multi-battery packs, but the principle of “same voltage,
connect multi-battery packs, but the principle of “same voltage,
same type” should be strictly followed.
same type” should be strictly followed.
2. For TN2-6000S/TN2-10000S, the connector of the external battery
2. For TN2-6000S/TN2-10000S, the connector of the external battery
cable is used to plug into the external battery socket of the UPS, the
cable is used to plug into the external battery socket of the UPS, the
other end of the external battery cable is made of three open wires
other end of the external battery cable is made of three open wires
with ring terminals to connect with the external battery pack(s). The
with ring terminals to connect with the external battery pack(s). The
procedure of installing battery bank should be complied with strictly.
procedure of installing battery bank should be complied with strictly.
Otherwise you may encounter the hazardous of electric shock.
Otherwise you may encounter the hazardous of electric shock.
1) A DC breaker must be connected between the battery pack and
1) A DC breaker must be connected between the battery pack and
the UPS. The capacity of breaker must be not less
the UPS. The capacity of breaker must be not less than the data
than the data
specified in the general specification.
specified in the general specification.
2) Set the battery pack breaker in “OFF” position and connect the
2) Set the battery pack breaker in “OFF” position and connect the
20 pieces of batteries in series.
20 pieces of batteries in series.
3) You must connect the external battery cable to the battery first,
3) You must connect the external battery cable to the battery first,
if you connect the cable to the
if you connect the cable to the UPS first, you may e
UPS first, you may encounter the
ncounter the
hazardous of electric shock. The positive pole of the battery is
hazardous of electric shock. The positive pole of the battery is
connected to the TN2-6000(S) UPS with red wire, and the
connected to the TN2-6000(S) UPS with red wire, and the
TN2-10000(S) UPS in parallel with blue and brown wires; the
TN2-10000(S) UPS in parallel with blue and brown wires; the
C
C
AUTION
AUTION
!!
O
O
NLY PERSONS ARE ADEQUATELY FAMILIAR WITH BATTERIES AND WITH
NLY PERSONS ARE ADEQUATELY FAMILIAR WITH BATTERIES AND WITH
THE REQUIRED PRECAUTIONARY MEASURES MAY INSTALL BATTERIES AND
THE REQUIRED PRECAUTIONARY MEASURES MAY INSTALL BATTERIES AND
SUPERVISE OPERATIONS
SUPERVISE OPERATIONS
..
U
U
NAUTHORISED PERSONS MUST BE KEPT WELL
NAUTHORISED PERSONS MUST BE KEPT WELL
AWAY FROM THE BATTERIES AND MUST NOT CONNECT THE BATTERIES
AWAY FROM THE BATTERIES AND MUST NOT CONNECT THE BATTERIES
..
FOR
FOR
THE CONNECTION OF EXTERNAL BATTERY BANKS YOU HAVE TO CONTACT
THE CONNECTION OF EXTERNAL BATTERY BANKS YOU HAVE TO CONTACT
TO THE DISTRIBUTOR OF SERVICE CENTER
TO THE DISTRIBUTOR OF SERVICE CENTER
..
IN OPPOSITE CASE THE
IN OPPOSITE CASE THE
COMPANY IS EXEMPTED FROM ANY RESPONSIBILITY AND THE WARRANTY OF
COMPANY IS EXEMPTED FROM ANY RESPONSIBILITY AND THE WARRANTY OF