Appendices
User Guide
Page 3-9
Power on sequence
Powering On
Make sure all QSFP cables and power cords are installed and connected properly
then follow the steps below to power on all equipment,
Step1. Power on ExaSAN storage;
Power on JBOD enclosure (if it exists) first, then power on RAID system; Storage
boots up ready until sound a beep and all front indicators become blue.
Step2. Power on ExaSAN switch;
Click power button of slave SW16-G3 first (if it exists) then click power button of
master SW16-G3; Switch boots up ready until sound 3 short beeps and all front
indicators turn blue.
Note
Master takes around 3 minutes to boot; Slave takes 30 seconds.
Step3. Power on host computer;
Powering Off
Follow the proper order to power off the SAN equipments.
Step1. Power off host computer;
Step2. Power off ExaSAN switch;
Click power button of master SW16-G3 will sound 5 short beeps, switches will
shutdown automatically in few seconds.
Step3. Power off ExaSAN storage;
Power off RAID system first, then power off JBOD enclosure (if it exists).
Note
1. Make sure to follow the proper power on sequence, wrong sequence may
result in unexpectedly problem.
2. Client computer with QSFP cable is NOT support Hot Plug; Thunderbolt
connection is support Hot Plug.
Summary of Contents for ExaSAN SW16-G3
Page 1: ...ExaSAN SW16 G3 User Guide Accusys Storage Ltd 2017 Version V1 0 ...
Page 7: ...1 Introduction User Guide 1 What is in the box ...
Page 9: ...Appendices User Guide Page 2 2 2 Introduce SW16 G3 ...
Page 12: ...Appendices User Guide Page 3 5 3 Build a SAN environment ...
Page 17: ...Appendices User Guide Page 4 10 4 Install Accusys host driver ...
Page 20: ...Appendices User Guide Page 5 13 5 Use SW16 G3 WebGUI ...
Page 29: ...Appendices User Guide Page 6 22 6 Manage Storage on RAIDGuardX ...
Page 31: ...Appendices User Guide Page 7 24 7 SW16 G3 Specification ...
Page 33: ...Appendices User Guide Page 8 26 8 FAQ ...
Page 35: ...Appendices User Guide Page 9 28 9 Customer Service ...