Accu-Steam™ Installation and Owners Manial
MP5004-1202
PAGE 19
1. Inspect the griddle packaging to ensure there are no missing components.
2. Complete the appropriate power disconnection procedures for existing equipment
or local power junction boxes.
3. Clean surfaces with grease solvents and dry off with clean rags or sponges.
4. Determine the location and orientation for the griddle and control panel modules.
Mark the centerline on the countertop for the griddle module, using a Carpenter’s
square. See Figure 2 for the countertop and control panel layouts. Continue the
centerline to the control panel module mounting surface. Accurate centerline
alignment of the countertop and control panel modules is critical to ensure the
correct alignment of the grease trough assembly to the griddle module.
Fig. 2
INSTALLATION DROP-IN GRIDDLE (cont.)
MODEL EGD
Summary of Contents for EGD Series S/N 7547
Page 23: ...Accu Steam Installation and Owners Manial MP5004 1202 PAGE 22 OPERATION model egd EGF ...
Page 26: ...Accu Steam Installation and Owners Manial MP5004 1202 PAGE 25 CLEANING model egd EGF ...
Page 31: ...Accu Steam Installation and Owners Manial MP5004 1202 PAGE 30 PARTS COMMERCIAL ...
Page 36: ...Accu Steam Installation and Owners Manial MP5004 1202 PAGE 35 PARTS MILITARY ...