Dear Customer
Congratulations on the purchase of your greenhouse. Thanks to this manual, no technical foreknowledge is required for assembling the
greenhouse. Reading through the manual step by step will allow you to prepare all necessary parts and acts for the assembly of your
greenhouse.
Safety and Efficiency
Glass is heavy, sharp-edged and fragile. A ladder is high and unstable. Aluminium profiles are sometimes long and sharp-edged. So, be careful
when you are not familiar with handling these materials. Therefore, it is better to keep children away during the assembly. Safety shoes, safety
glasses and safety gloves may therefore be very useful and are essential when assembling glass
.
Tools:
-
2x 10mm screw-wrenches
-
Knife or solid scissors
-
Star screwdriver (large type)
-
Flat screw-driver (large type)
-
Spirit level
-
Shovel
-
Rope or measuring rod min. 7 meters
-
Ladder (self-standing)
Tools available in all D.I.Y.-shops:
-
N
eutral silicone kit
-
Quick-drying concrete to solidly anchor your greenhouse
Petty Facts
-
Bolt slots are slots in which fits a bolt head. Nearly all profiles in this greenhouse have 1 or more bolt slots.
-
In the event of bolt slot connections, always make sure that the profiles are closely pressed to one another.
-
Stop bolts are bolts that we slide in a slot in preparation of further assembly; these bolts are temporarily retained by nuts at some 10cm
of the profile end.
-
A greenhouse consists of 2 façades (front and back), 2 sidewalls and a roof.
-
Except when explicitly mentioned otherwise, short bolts (M6X10) are used.
Advice
Always use
ALL
detailed views as aid to align, line up and position your profile. Pay attention to section and perforations.
When fixing the nuts on the bolts, only make 2 turns; only definitively tighten the bolts and nuts
after
having gone through the
entire
page.
V
Summary of Contents for S208H
Page 1: ...Manual S208H B...
Page 2: ......
Page 39: ...2 FRAME KADER CADRE 4 1a 1b RAHMEN 1a 1b 1a 1b 1a 1b 2 2 2 2 1a 1b...
Page 44: ...2 2 A B A B 2 2 2 2 PREPARATION VOORBEREIDING PR PARATION 8 1 VORBEREITUNG...
Page 49: ...3 4 DOOR DEUR PORTE 13 1 2 T R 1 2 3 4...
Page 51: ...a b 1 15 DOOR DEUR PORTE T R 1 2 2 2X...
Page 58: ...3 2 1 1 2 3 WINDOW OPENER RAAMOPENER OUVRE FEN TRE FENSTER FFNER 21 EN OPTION OPTIONEEL...
Page 59: ...3 7 5 6 4 1 2 8 RAAMOPENER OUVRE FEN TRE WINDOW OPENER FENSTER FFNER 22 a b 3 6 5 7 1 4 2 8...
Page 61: ...ABDECKPLATTEN PLAQUETTES DE FINITION 24 COVER PLATES AFDEKPLAATJES...