background image

 

 

not reverse. If it is reversed, the machine will be damaged and it cannot be used 

anymore. 

 

4.  Connect  the  wires  of  the solar  panel,  pay  attention  to  the  positive  and 

negative poles, do not reverse; if there is sunlight, the solar controller inside the 

machine will charge the battery, otherwise check the connection cable is correct. 

 

5. Finally connect the load and then the city power line. 

 

Warning 

Installation  must  be  performed  by  qualified  technicians  with  reference  to 

relevant safety standards

 

 

Environment 

1.

 

The equipment must be installed vertically on a horizontal shelf or on 

the ground. Do not stack objects on the equipment

 

2.

 

The  ambient  temperature  range  for  equipment  operation  is  0°C  to 

40°C,  and  the  ideal  temperature  condition  is  15°C  to  25°C;  the  air 

humidity is 0-95% without condensation; the battery life is defined at 

20°C,  starting  from  20°C  each  Increasing  10°C  will  reduce  the 

expected service life by 50%. 

 

 

 

 

 

 

Space size 

1. Placement of equipment 

Leave  20cm space at the top and  four  sides  of  the  device to keep the 

air pass unimpededly 

Summary of Contents for 500W/18V

Page 1: ...User Manual Solar Inversion Power Supply System ...

Page 2: ......

Page 3: ...ations 16 Introduction This manual contains the installation operation and use of the device Please read before installing the equipment The operation of the equipment shall be undertaken by professionals in order to ensure the normal operation of the equipment This manual should be kept properly In order to run the equipment it can be used as a reference at any time Basic instructions Solar power...

Page 4: ...e products Solar power inverter combined PV Controller Battery Specific technical parameters are listed in Appendix I II Technical Specifications Ⅰ Structure overview Hybrid inverter structure Characteristic 1 Pure sine wave AC output strong capacity to adapt to the loads 2 Microcomputer CPU control technology excellent performance 3 Full protection function overload short circuit over voltage und...

Page 5: ...ime turn off the equipment and use a dry powder fire extinguisher Using the liquid to extinguish the fire may cause a risk of electric shock 5 Do not place the container filled with liquid on the top of the device so as not to pour it into the device and cause an internal short circuit resulting in electric shock or fire hazard 6 Do not open the device chassis by yourself There is a danger of elec...

Page 6: ...d storage Transportation When the goods are sent they have been thoroughly inspected After receiving the goods please check whether the packaging is damaged or not If there is any damage or missing items you must notify the dealer within 7 days after receiving the goods Unpacking To avoid damage to the equipment special care should be taken when moving the equipment when unpacking the packaging ma...

Page 7: ...violent impact can damage the equipment Ⅳ Panel indication ...

Page 8: ...Ⅵ installation picture ...

Page 9: ...of danger of electric shock 2 Wire preparation first determine the length of the wire determine the location of the installation reduce the length of the wire as much as possible to reduce the power loss 3 First connect the battery pay attention to the positive and negative do ...

Page 10: ...d by qualified technicians with reference to relevant safety standards Environment 1 The equipment must be installed vertically on a horizontal shelf or on the ground Do not stack objects on the equipment 2 The ambient temperature range for equipment operation is 0 C to 40 C and the ideal temperature condition is 15 C to 25 C the air humidity is 0 95 without condensation the battery life is define...

Page 11: ...st be configured Ⅷ equipment operation Read the equipment manual carefully before operating the equipment The equipment should be in charge of the professional to ensure the normal operation of the equipment Danger 1 After the inverter connected to the mains means city power the inverter output may be in a live state means will have electricity even if the inverter is not manually turned on 2 If t...

Page 12: ...ncy Hz Grid power Priority model Same as Grid power Battery power priority model 12 0 5 Voltage VAC Grid power Priority model Same as Grid power Battery power priority model 230 5 Shift time Typical 6ms Auto shift Protection Overload The inverter will be shut down automatically and warn with light and sounds after 25 seconds when get overload by 105 130 after 3 seconds when get overload more than ...

Page 13: ...gram of the inverter panel Refer to page 5 Remarks All technical parameters are subject to change without notice Customer specific products is accepted by our company Appendix 2 Solar controller specification System voltage 18V Solar controller charge current 5A System charge current 5A Solar input voltage 20V Over voltage protect 15V 1 Working temperature 20 to 60 Note Specifications are subject ...