25
Setting up the system
Pre-installation requirements
Selecting a site
Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:
•
Near a grounded power outlet
•
Clean and dust-free
•
Stable surface free from vibration
•
Well-ventilated and away from sources of heat
•
Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
•
Acer Altos G5450 system
•
Acer EasyBUILD
TM
DVD Pack
•
Acer Altos G5450 accessory box
•
System keys (attached to the rear of the bezel door)
If any of the above items are damaged or missing, contact your dealer
immediately.
Save the boxes and packing materials for future use.
Summary of Contents for Altos G5450 Series
Page 1: ...Acer Altos G5450 Series User s Guide ...
Page 18: ...xviii ...
Page 19: ...1 System tour ...
Page 32: ...1 System tour 14 System boards Mainboard ...
Page 41: ...2 System setup ...
Page 50: ...2 System setup 32 ...
Page 51: ...3 System upgrade ...
Page 85: ...4 System BIOS ...
Page 86: ...4 System BIOS 68 ...
Page 113: ...5 System troubleshooting ...
Page 124: ...5 System troubleshooting 106 ...
Page 125: ...Appendix A Server management tools ...
Page 133: ...Appendix B Rack mount configuration ...
Page 134: ...This appendix shows you how to set up the Altos G5450 server in a rack mount configuration ...