123
Preparing the rack for server installation
1
Install eight distands into the vertical rails of the system rack.
2
Adjust the front bracket to the preferred length.
(1) Turn the captive thumbscrews counterclockwise to loosen
them.
(2) Slide the front bracket to the preferred length.
(3) Secure the front bracket in its preferred position by turning
the captive thumbscrews clockwise.
Do the same thing to the other front bracket.
Summary of Contents for Altos G5450 Series
Page 1: ...Acer Altos G5450 Series User s Guide ...
Page 18: ...xviii ...
Page 19: ...1 System tour ...
Page 32: ...1 System tour 14 System boards Mainboard ...
Page 41: ...2 System setup ...
Page 50: ...2 System setup 32 ...
Page 51: ...3 System upgrade ...
Page 85: ...4 System BIOS ...
Page 86: ...4 System BIOS 68 ...
Page 113: ...5 System troubleshooting ...
Page 124: ...5 System troubleshooting 106 ...
Page 125: ...Appendix A Server management tools ...
Page 133: ...Appendix B Rack mount configuration ...
Page 134: ...This appendix shows you how to set up the Altos G5450 server in a rack mount configuration ...