43
Tools and supplies needed
You will need the following items in installing the system components:
•
Phillips screwdriver
•
Small flat-bladed screwdriver
•
Extraction tool for processor heat sink clips
•
Antistatic wrist strap and conductive foam pad (recommended)
•
Pen or pencil
•
Equipment log (for a sample sheet, refer to page 197)
As you integrate new components into the system, record the
model and serial number of the server system, all installed options,
and any other pertinent information specific to the server system.
You will need this information when running the SSU.
AA G900 ug - EN.book Page 43 Wednesday, September 25, 2002 5:23 PM
Summary of Contents for Altos G900
Page 1: ...Acer Altos G900 User s guide ...
Page 10: ...x ...
Page 16: ...xvi ...
Page 17: ...1 System tour ...
Page 43: ...2 System setup ...
Page 44: ...This chapter describes the system setup procedures both for hardware and software aspects ...
Page 55: ...3 Hardware configuration ...
Page 56: ...This chapter describes detailed procedures for system hardware setup ...
Page 127: ...4 BIOS setup ...
Page 160: ...4 BIOS setup 144 ...
Page 161: ...Appendix A System rack installation ...
Page 162: ...This appendix describes the procedures for configuring the system in a rack mount fashion ...
Page 175: ...159 5 Slide the server into the rack Figure 70 Mounting the server to the rack ...
Page 176: ...Appendix A System rack installation 160 ...
Page 177: ...Appendix B System management ...
Page 210: ...Appendix B System management 194 ...
Page 211: ...Appendix C Equipment log and configuration worksheets ...
Page 217: ...201 ...
Page 218: ...Appendix C Equipment log and configuration worksheets 202 ...
Page 219: ...Appendix D Troubleshooting ...