3 System upgrades
28
Installation precautions
Before you install any server component, it is recommended that you
read the following sections first. These sections contain important ESD
precautions along with pre-installation and post-installation
procedures.
ESD precautions
Electrostatic discharge (ESD) can damage static-sensitive hardware
components, such as the processor, disk drives, and the system board.
Always observe the following precautions before you install a server
component:
•
Do not remove a component from its protective packaging until
you are ready to install it.
•
Do not touch the component pins, leads, or circuitry.
•
Components with a Printed Circuit Board (PCB) assembly should
always be laid with the assembly-side down.
•
Wear a wrist grounding strap and attach it to a metal part of the
server before handling components. If a wrist strap is not
available, maintain contact with the server throughout any
procedure requiring ESD protection.
•
Keep the work area free of nonconductive materials, such as
ordinary plastic assembly aids and foam packing.
Pre-installation instructions
Perform the steps below before you open the server or before your
remove or replace any component.
Warning! Failure to properly turn off the server before you start
perform any hardware configuration may cause serious damage
and bodily harm. Do not attempt the procedures described in the
following sections unless you are a qualified service technician.
1
Turn off the server and all connected peripherals.
2
Unplug all power cables from their outlets.
3
Disconnect all telecommunication cables from their ports.
Summary of Contents for AT310 F1 Series
Page 1: ...AT310 F1 Series User Guide ...
Page 14: ...xiv ...
Page 18: ...xviii ...
Page 19: ...1 System tour ...
Page 34: ...1 System tour 16 ...
Page 35: ...2 System setup ...
Page 44: ...2 System setup 26 ...
Page 45: ...3 System upgrades ...
Page 74: ...3 System upgrades 56 ...
Page 75: ...4 System BIOS ...
Page 108: ...4 System BIOS 90 ...
Page 109: ...5 System troubleshooting ...
Page 119: ...Appendix A Server management tools ...
Page 125: ...Appendix B Rack mount configuration ...
Page 137: ...Appendix C Acer Smart Console ...