2
CONTENTS
PREFACE
1.
Machine Assembly
2.
ELECTRICAL CIRCUIT
CONTROL
2-1 Electrical Wiring
2-2 Electrical Equipment
2-3 Electrical Cautions
2-4 Circuit Diagram
2-5 Operation Symbols
3.
UNPACKING & MACHINE
INSTALLATION
3-1 Unpacking & Lifting
3-2 Basic Foundation
4. MAJOR CONSTRUCTION
4-1 Headstock
4-2 Spindle
4-3 Spindle Speed Selection
4-4 Carriage Slide
4-5 Tailstock
4-6 Apron
4-7 Gear Box
4-8 Thread Chasing Dial
4-9 Steady Rest
4-10 Brake System
5. LUBRICATION
5-1 Headstock Lubrication
5-2 Gear Box & Apron Lubrication
5-3 Lubrication Charts
5-4 Lubrication Location
Summary of Contents for Dynamic 33130
Page 5: ...5 1 Machine Assembly ...
Page 9: ...9 2 4 Circuit Diagram ...
Page 26: ...26 7 Leadscrew Add oil with oil gun As required Once per day 8 Bedways Auto lubrication ...
Page 27: ...27 5 4 Lubrication Location A Oil input hole B Oil drain hole ...
Page 33: ...33 7 1 Headstock Assembly ...
Page 39: ...39 7 2 Gear Box Assembly ...
Page 43: ...43 7 3 Gear Box Cover Assembly ...
Page 45: ...45 7 4 Apron Assembly Right Hand ...
Page 50: ...50 7 4 Apron Assembly Left Hand ...
Page 56: ...56 7 5 Machine Bed and Base Assembly ...
Page 60: ...60 7 6 Brake System ...
Page 63: ...63 7 7 Carriage and Crossfeed System ...
Page 67: ...67 7 8 Tailstock ...
Page 71: ...71 7 9 Chip Guard ...
Page 73: ...73 7 10 Leadscrew Cover and Rear Splash Guard ...