41
2. Assembly FM Module:
Place FM on “HLD FM” surface(Fig. 2-1) and use “Clip FM” to fix FM(Fig. 2-2).
Fig. 2-1
Fig. 2-2
3. Assembly HSG ILL Module:
3.1 CM Assembly
I. Insert “Clip CM Side” first, and then place “Clip Front CM” to fixed-shaft of ILL SUB
before locking screw (Fig. 3-1, Fig. 3-2).
II. Assemble CM to HSG ILL and to make CM contact three datum on the HSG ILL
Well (Fig. 3-3).
III. Assemble “CLIP TOP CM” (with forceps) to the “HSG IL” (Fig. 3-4,).
IV. To check and make sure “CLIP of CM” hooks the HSG ILL very Well (Fig. 3-5).
V. Paste “Sponge tube AL” on cannelure of” HSG ILL” (Fig. 3-6).
6.2 FM Module Assembly
1. FM Module must be placed to fixed shaft and on the datum surface of “ILL SUB”
and then lock with screw well (Fig. 3-7).
Fig. 3-1
Fig. 3-2
Screw
8F.1A752.3R0
Clip CM Side
Fixed shafts
of ILL SUB
Touch the
side surface
Clip FM hook
the punch points
Summary of Contents for X1230S Series
Page 16: ...16 Product Overview...
Page 17: ...17...
Page 18: ...18...
Page 19: ...19...
Page 42: ...42 Fig 3 3 Fig 3 4 Fig 3 5 Fig 3 6 Datum1 Datum2 Datum3 Clip UP CM Sponge...
Page 53: ...53 This cord location is here First assy Blower module Second assy Mylar Ballast...
Page 54: ...54 3 Blower wire alignment This clip must be screwed by this direction...
Page 58: ...58 11 Lamp Door screw assemble sequence First Second Third...
Page 62: ...62 Power Supply Problems Checking Flow...
Page 63: ...63...
Page 76: ...76...
Page 77: ...77 Module 2 ASSY UPPER CASE...
Page 78: ...78 Module 3 ASSY LOWER CASE...
Page 79: ...79 Module 4 ASSY FRONT CASE...