C
HAPTER
0
A
PPENDIX
B
C
HAPTER
0
C
HECKLIST
Use the following checklists to help verify the correct installation of MTUs.
General
Is the MTU mounted securely?
Is it mounted perpendicular to the ground with the Aclara logo facing
you?
Is there a minimum of 1 inch clearance above the MTU?
If mounting multiple MTUs side by side, is there at least 4 inches between
them?
If mounting multiple MTUs above one another, is there at least 3 inches
between them?
Is there minimum of 6 inches of clearance between the MTU and any
pipes, conduit, downspouts, etc.?
Is there a minimum of 5 feet of clearance between the MTU and any
large metal objects, such as dumpsters, HVAC ducts, or cabinets?
Is there any damage to the wiring (e.g. nicks or cuts)?
Exterior
Is the MTU mounted at least 12 inches above the ground?
Is the MTU mounted so that it is not transmitting directly into a metal
fence?
Are wire splices made using silicone electrical gel filled IDCs?
Interior
Is the MTU mounted in a room without a metal ceiling?
Is the MTU mounted near an exterior wall?
If located in a basement, is the MTU mounted as high as possible?
Meter Pit
Is the MTU mounted securely to a non-metallic lid?
Is the MTU mounted with the Aclara logo facing the lid?
Are wire splices made using silicone gel filled electrical insulating IDCs
and appropriate direct burial kit?
If necessary, is the MTU mounted with the appropriate spacers?
Summary of Contents for MTU
Page 2: ......
Page 4: ...ii M T U I n s t a l l a t i o n G u i d e l i n e s Table of Contents...
Page 6: ...iv M T U I n s t a l l a t i o n G u i d e l i n e s FCC IC Compliance...
Page 14: ...8 M T U I n s t a l l a t i o n G u i d e l i n e s Signal Propagation...
Page 28: ...22 M T U I n s t a l l a t i o n G u i d e l i n e s...
Page 30: ......