29
Ozone Enclosure and System Light Check
During normal operation, both the main power light and the ozone power light are on
when the main switch is on and water is flowing downstream of system.
1. ON/OFF Switch
Controls the power supply to the ozone system.
2. Main Power Light
Indicates power supply to the unit and ON/OFF switch is
on.
3. Main Power Fuse
20 amp ceramic slow blow fuse and fuse body holder.
Push and turn to replace fuse.
4. Ozone Power Light
Indicates system is operating and ozone production is
occurring.
5. Ozone Power Fuse
1 amp slow-blow fuse and fuse body holder. Push and turn
to replace.
1- Main Power Switch ON/OFF
2- Main Power Light (RED)
3- Main Power Fuse (15 A)
4- Ozone Power Light (Green)
5- Ozone Power Fuse (0.5 A)
Summary of Contents for AOWT-7
Page 9: ...9 System Components...
Page 10: ...10 NOTE System components and tank may not be exactly as shown...
Page 47: ...47 Appendix Component Specification Sheets Pumps Specifications...
Page 48: ...48...
Page 49: ...49...
Page 50: ...50 Flow Switch Specifications...
Page 51: ...51...
Page 52: ...52 Mazzei Specifications...
Page 53: ...53 Gas Off 1 Specifications...