-
-
96
Item Name
Constant to be set
Factory Preset
Operation Selection after
Momentary Power Loss
46
0000
Speed Search Operation Level
54
150%
Minimum Baseblock Time
55
0.5s
Even if a momentary power loss occurs, operation can be continued without any problem.
46 = X X X 0
Momentary power loss assurance time differs as shown below, according to the capactiy of the models.
(common to both 3-phase and single-phase series)
˙
0.5 to 1HP (0.4 to 0.75Kw): Approx. 1 second
˙
2 to 10HP(1.5 to 7.5Kw): Approx. 2 seconds
Note :If
a power loss exceeds the momentary power loss assurance time, in the momentary power loss
assurance time after the power loss, low voltage fault occurs, fault contact is output and the motor
coasts to stop.
1
st
digit
0: Continuous operation not provided after
momentary power loss
1: Continuous operation provided after
momentary power loss