Step 4: Install the Card
Front Panel LEDs
Indicator
Purpose
Color
State
Meaning
STATUS
Module status
Orange, blinking
Warning
Red, blinking
Error
White, blinking
OK (card ready)
Startup sequence
The following table indicates step by step the initialization sequence of the card, with
corresponding states of the LEDs.
Steps
Actions
Front Panel
LED
DONE
LED
PCIe LEDs
Notes / comments
1
Turn on the
PCIe extender
OFF
OFF
All are ON
The FPGA is not yet programmed
2
Program the
Tandem1 part
into the
NorFlash using
the JTAG cable
OFF
ON
ON
The Xilinx SW tools programs the
NorFlash interface into the FPGA
3
Restart the
PCIe extender
ORANGE
Solid
ON
OFF
The stage 1 is programmed into the
FPGA
4
Program the
Tandem2 using
JTAG
BLUE Solid
ON
OFF
The stage 2 is programmed into the
FPGA
5
Start the PC
BLUE
intermittent
ON
Follow the
PCIe
current
status
The FPGA is correctly programmed.
The module is detected into the
Device Manager (Acqiris Signal
Acquisition Intruments
6
Turn off the PC
WHITE Solid
ON
OFF
The FPGA is always well
programmed
7
Restart the
PCIe extender
ORANGE
Solid
ON
OFF
The Tandem1 stage is well
programmed into the FPGA
If warning or error status is observed, power-cycle the host computer (if using a PCIe
expansion chassis, observe the power sequence requirements).
If the error persists please contact technical support
.
16
Acqiris SA217P Startup Guide