background image

Operation Manual, Xymba XB43/53 

Version V1.2   

12 

© 2008, Acronova Technology, Inc. 

unlock and lift to open.    The lock also secures the Finish Disc 
Bin. 

 

Reject Disc Tray

 

The Reject Disc Tray, with a 3 disc capacity, receives the rejected 
discs.    Pull down to open. 

 

Reject Disc Slot

 

The slot where rejected discs will be discarded when the reject 
tray is in its closed position. 

Finish Disc Bin or Output Ramp 

Depending on the configuration of your device during 
purchase it may come with a Finish Disc Bin or Output 
Ramp.    The Finish Disc Bin is where completed discs 
are stored.      Be sure to unlock the Disc Storage 
cabinet before removing the Finish Disc Bin.    The 
Finish Disc Bin must be in position during operation.   
Completed Discs will be stacked in the Finish Disc Bin 
with the labeled side facing down. 

The Output Ramp configuration can receive up to five 
discs when in position.    Once the Output Ramp is full, 
any overflow discs will be pushed off the ramp.    The 
use of a container is suggested to collect any overflow 
discs.    The Output Ramp must be in the pulled down 
position during operation.    Closing the Output Ramp 
during a session will stop the operation immediately 
after the current disc being written to has completed.     
Completed Discs will be placed in the Output Ramp with the labeled 
side facing up. 

Rear View 

 

USB Port

 

Connects Xymba to the 
host PC. 

 

Power Socket

 

Use the provided power 
cord to connect Xymba to 
a wall outlet. 

 

Power Switch

 

Turn Xymba on and off. 

Summary of Contents for Xymba XB43 Series

Page 1: ...ation Manual Xymba Automated Disc Publisher Model XB43 53 Series PC Connected Serial Number ______________________________ The serial number is labeled on the rear panel of the device O PERATIONAL M A...

Page 2: ...Operation Manual Xymba XB43 53 Version V1 2 2 2008 Acronova Technology Inc This page is intentionally left blank...

Page 3: ...ot move this device while the power is on Handle with care This device generates heat during the duplication process Out of specification or unstable power supply may cause overheating low productivit...

Page 4: ...the equipment to an outlet on a circuit different from that to which the receiver is connected Consult the dealer or an experienced radio TV technician Use of shielded cables is required to comply wit...

Page 5: ...logy Inc be liable for direct indirect special incidental tort economic contingent or consequential damages resulting from any defect in this product or its documentation including without limitation...

Page 6: ...Operation Manual Xymba XB43 53 Version V1 2 6 2008 Acronova Technology Inc This page is intentionally left blank...

Page 7: ...Finding a Place for Xymba 14 Xymba Installation 14 Software Installation 15 System Requirements 15 Device Driver Installation 15 Before Getting Started 17 Tips for Handling Optical Discs 17 What You N...

Page 8: ...y 3 discs unlimited discs using Reject Disc Slot Write Speed CD R 40X CD RW 32X DVD R 18X DVD R Dual 10X DVD RW 6X DVD RW 8X Blu ray 4X XB43 BR XB53 BR Operation Method PC Connected software required...

Page 9: ...urning discs Xymba can also automatically rip or read a stack of discs by running compatible software Refer to the operation manual that came with the software for further details If you have purchase...

Page 10: ...your package please check to see if any pieces are missing or damaged If any part is missing or damaged contact your local dealer immediately The items listed below should be included in the package O...

Page 11: ...ecorders Xymba XB43 CD DVD recorder with removable lockable bin Xymba XB53 CD DVD recorder with open ramp Xymba XB43LS LightScribe enabled CD DVD recorder with removable lockable bin Xymba XB53LS Ligh...

Page 12: ...Finish Disc Bin The Finish Disc Bin must be in position during operation Completed Discs will be stacked in the Finish Disc Bin with the labeled side facing down The Output Ramp configuration can rec...

Page 13: ...s status is reflected by the LED indicators When turned on it will enter initialization indicated by a flashing green ready light When initialization is complete the ready light will change to steady...

Page 14: ...cs Do not expose the unit to direct sunlight or high humidity as it may cause the unit to malfunction Xymba Installation Follow the steps below to complete Xymba s hardware installation 1 Place Xymba...

Page 15: ...o complete Xymba s device driver installation 1 Connect the power cord to Xymba and a wall outlet 2 Turn the power switch to the On position 3 Turn Xymba on Wait patiently until the installation is co...

Page 16: ...Operation Manual Xymba XB43 53 Version V1 2 16 2008 Acronova Technology Inc This page is intentionally left blank...

Page 17: ...irmly resting on the three wheels seen in the illustration to the right You may then gradually load additional discs on top of the first disc until the loader is full Xymba processes discs in a First...

Page 18: ...previously explained Follow the steps below to get your Xymba ready 1 Connect the power cord to Xymba and a wall outlet 2 Turn Xymba s power switch to the On position 3 Connect the USB cable to both...

Page 19: ...Version V1 2 Operation Manual Xymba XB43 53 2008 Acronova Technology Inc 19 This page is intentionally left blank...

Page 20: ...rand of disc There are many different brands speeds and CD DVD recordable media formats on the market We do our best to test certain media types It is impossible for us to guarantee that all discs wil...

Page 21: ...speed for a single recorder duplicating a 4 7 GB DVD should not take more than 8 minutes Please check both the quality of the blank and the master disc if the duplication process takes more than 8 min...

Page 22: ...tching the power on and off Why does the disc loader fail to pick up the disc Check to see if the disc is the standard size 120mm Make sure the discs are not bent or damaged Why is the disc unloader d...

Page 23: ...Version V1 2 Operation Manual Xymba XB43 53 2008 Acronova Technology Inc 23 This page is intentionally left blank...

Page 24: ...Operation Manual Xymba XB43 53 Version V1 2 24 2008 Acronova Technology Inc Acronova Technology Inc http www acronova com Manual Ver 1 2 January 2009 Part 711 XB43 9AC6 2...

Reviews: