Section 1 – Skirting Assembly
1.1
Lay out the Skirting on a clear, dry level
surface as shown in Figure 1.
Figure 1
1.2
Secure one end of the skirting to the Lower pole tube as shown in Figures 2 & 3.
1.3
There are four pre-sewn loops and four tying straps with carabiner clips at the top of the
skirting, each is in line to the enclosure with carabiner clip to each loop by going over
the lowest hook and loop tape. See Figures 4 & 5. Secure the other end of the skirting
to the Lower pole as Figure 6.