Fixing the Swing Hooks:
To attach the swing hook, push in the hinged clasp on the swing hook. Then place the centre of the
swing attachments, metal ring, into the middle of the clasp. Then ensure the clasp has fully closed
before use.
You should now have completed your Carisbrooke climbing frame. It is now time to check all screws
and bolts to ensure they are fully tightened. Also check that all platforms are level and all posts are
upright. Ensure the two towers line up with each other. Once you are fully happy with the above, it
is time to concrete (post-crete) the uprights, bottom of stairs and the swing frame supports. When
the concrete has gone off (set) you can replace the 50mm of grass that was removed at the start of
construction. If you use concrete , at least 24 hours must pass before use of the climbing frame can
start. Post-Crete sets quicker so, you may use the climbing frame in most cases within an hour.