Health and Safety

This process must be undertaken by a competent 

persons. More than one person may be required to 

ensure the safe handling of large dampers and other 

materials. Use must be made of access equipment 

to ensure unsafe practices are not used to approach 

walls or difficult access areas.
Standard site PPE should be used (minimum steel 

toe cap boots, hard hat) together with any protective 

eyewear, gloves and masks, when drilling or cutting 

is being undertaken. The latter should also be used 

when handing the wall construction materials, as 

defined by the material suppliers. If loud equipment  

is being used, hearing protection should be used.
All waste materials should be collected and disposed 

of as defined by the relevant supplier.

Rigid or dry Walls or Concrete Floor 

construction

Damper installation method
1. Measure the overall damper casing diameter. 

Calculate the finished square hole size by adding 

10mm ± 5mm to both width and height (For drywall 

partitions calculate the hole to cut size by adding  

two board thickness to the finished hole width  

and height). 
2. Mark out the hole on the partition and cut it out, 

cutting the top and bottom edges first to maintain 

stability.
3. For drywall partitions, frame out the hole with  

stud and track and cover this with board. Finish 

edges with joint filler.
4. Install the damper and fasten one installation 

flange so the blade in its closed position is in  

the centre of the wall.
5. Fill the 4 triangular voids between the damper  

and the edges of the hole with fire rated stone wool.
6. Fit the remaining installation flange.

Summary of Contents for CSS

Page 1: ...ion should be used All waste materials should be collected and disposed of as defined by the relevant supplier Rigid or dry Walls or Concrete Floor construction Damper installation method 1 Measure the overall damper casing diameter Calculate the finished square hole size by adding 10mm 5mm to both width and height For drywall partitions calculate the hole to cut size by adding two board thickness...

Page 2: ...eriodic maintenance As detailed in BS 9999 2008 1 For dampers this is at least once per year for units with spring operation 2 Units operating in dusty atmospheres should be frequently often to suit the severity of the conditions 3 Units associated with systems may be required to be checked as part of the system as often as once per week or month to ensure ongoing confidence in the life safety sys...

Page 3: ...blems are foreseen 8 Using the access opening provided are the damper blades in the open position Check position of damper blades 9 Has the damper been checked for internal cleanliness free from damage and that vertical casings in particular are free from debris With the damper in the closed position inspect for damage 10 Has the damper been released to simulate operation of the thermal release Da...

Page 4: ...ing screws supplied with the ETR For damper size Ø100mm fit to pre punched hole in the side of mode bracket and through a grommet in case beneath Tighten using a No 1 Pozidriv screwdriver to tighten the two self tapping screws supplied with the ETR NOTE fully tighten the ETR so that its two part case is completely together to ensure electrical continuity inside Electrical Connection and Final Oper...