background image

 

 

 

 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Assessed to ISO 9001:2008      

LPCB Cert No. 17

 

 

    

LPS1162 Cert No. 017a  

 

 

 

 

Smoke Shield PTC 

 product brochure 

Please scan 

QR code for 

smart phone 

version.

 

 

 
 

 

Ruskin Air Management LTD

Actionair, Whitstable,

Kent CT5 3DU

12

RAM-F-024 A

EN 15650:2010

SMOKE SHIELD PTC

LEAKAGE RATED

SS I/F

E120 (ve ho i

o)S

SS DWFX-C

SS DWFX-F

SS OSW

E120 (ve i

o)S

SS S&A

E120 (ve i

o)S

E120 (ho i

o)

E90 (ho i

o)S

Sensing element:

Response temperature: 72°C
Load Bearing capacity: N/A
Closure times
M5 & 6: ~22s (@ tamb = 20°C)
M5-3P: ~16s (@ tamb = 20°C)

Corrosion tested to En 60068-2-52: Pass

Operational reliability:
20,000 cycles: Pass

Ambient leakage test: Pass

LPS 1162: Issue 4

Cert No : 017a / 04

LPCB

0832-CPR-P0002

Summary of Contents for SmokeShield PTC

Page 1: ...ion for the Electrical Thermal Release ETR to be mounted through the ductwork Ideally this should be in the top half of the duct and or above the level of the interface Apply the self adhesive template located on the rear of the ETR and drill the necessary holes Ø3mm Ø9 5 Ø11mm Push the ETR through the duct and ensure that both screws are used to hold it in position Both screws should be tightened...

Page 2: ...TF 72 C AC 250V 6 3 A BROWN BLUE 1 2 3 4 5 6 L1 SUPPLY 230V AC 50 60Hz TYPICALLY 12W MOTORING 4W RESET COMMON COMMON VOLT FREE CONTACT MADE BETWEEN 1 2 WHEN DAMPER FULLY RELEASED VOLT FREE CONTACT MADE BETWEEN 4 6 WHEN DAMPER FULLY RESET M AC DC 24V 50 60 Hz 14 VA 12 4 W 30 C 50 C CONTINUOUS ELECTRICAL THERMAL RELEASE ETR MUST BE FITTED TO DUCTING FOR DAMPER OPERATION SPRING BIASED TEST SWITCH TF ...

Page 3: ...010 SMOKE SHIELD PTC LEAKAGE RATED SS I F E120 ve ho i o S SS DWFX C SS DWFX F SS OSW E120 ve i o S SS S A E120 ve i o S E120 ho i o E90 ho i o S Sensing element Response temperature 72 C Load Bearing capacity N A Closure times M5 6 22s tamb 20 C M5 3P 16s tamb 20 C Corrosion tested to En 60068 2 52 Pass Operational reliability 20 000 cycles Pass Ambient leakage test Pass LPS 1162 Issue 4 Cert No ...

Page 4: ...ot over tighten The mode is incorrectly wired Check wiring in accordance with procedures The ETR cables have been damaged or tampered with Replace with new mode Control Mode operates but limited or no movement of damper blades is observed The mode is not correctly synchronised with the interface Remove motor from interface Check motor in fully released state Set position of interface and refit mot...

Reviews: