Installation and Commissioning Guide - Bulkhead 2 Split System
Doc. No. 9590-5011
Ver. 1 211217
14
Installation and Commissioning Guide
Bulkhead Split System
10.05. Motor and Drainpipe Maintenance
CAUTION
Ensure correct electrical tag out procedures are followed before commencing work.
(Take rear ventilated as example)
Motor Maintainance:
1. Remove the ventilated panel.
2. Remove the blower housing.
3. Remove the motor.
Wall
Indoor
Outdoor
≈
12mm
Motor
Blower housing
Ventilated panel
Drain Pump Maintenance:
1. Unplug pump power supply and water level switch cable.
2. Remove four screws from drain pump..
3. Take off pump.
Wall
Indoor
Outdoor
≈
12mm
Motor
Blower housing
Ventilated panel
Pump