09. Unit Lifting Procedure
WARNING
WH&S regulations must be observed and will take precedence during lifting process.
Crane Lifting Method
Crane lifting method is recommended for high rise lifting.
A
Fig. 1
SPREADER
BAR
Provide rubber
pads between the
spreader bar and
unit to prevent
damage to the unit
DETAIL A
OUTDOOR
UNIT
Slip nylon slings
through the pallet
Connect the loop ends
of slings into shackle
Equipment Required For Crane Lifting:
• 1 Shackle
• 2 x Nylon Slings
• Spreader bars
Refer to catalogue for unit weight before selecting shackles and slings.
NOTE
Refer to Unit Dimensions and Clearances section for unit weight before selecting shackle and slings.
Procedure:
1. Slip nylon slings through the pallet as shown in Fig. 1.
2. Use a Bow or Dee shackle to connect the slings.
3. Ensure slings are protected by rubber pads or similar if slings are draped across unit edges, corners, or air grilles .
This will prevent the unit from being damaged during lifting.
4. SPREADER BARS must be used when lifting the unit.
5. Test lift the unit to determine exact unit balance and stability before hoisting it to the installation location.