Installation and Commissioning Guide
Hercules Package Unit
75
Installation and Commissioning Guide - Hercules Package Unit
Doc. No.0525-021
Ver. 21 221110
29. Start Up and Commissioning Report
Hercules Setting Log:
NOTES
Please log all required information below, before any software changes are to be made. Failure to do so will cause difficulties in
re-starting the unit operation back to original settings. Leave this manual in a secure location near the unit.
It is IMPORTANT to check that VSD speed bypass setting is configured as document 0525-049, VSD Configuration for setup
procedure.
INSTALLATION INFORMATION
CUSTOMER
Name:
Tel. Number:
Address:
INSTALLER
Name:
Tel. Number:
Address:
Site Address:
Date Installed:
Model:
Serial Number:
Clock:
Enable Scheduler:
Yes
DST:
ENABLE
DISABLE
(1)Transition Time:
min
No
(1)
(2)
Start:
in
at
(2)
End:
in
at
NOTE:
(1)
SKIP SCHEDULER below;
(2)
Only visible when DST is
ENABLED.
Mode Of Operation:
Mode:
AUTO CHANGE OVER
COOL ONLY
HEAT ONLY
FAN ONLY
Setpoint:
Room Setpoint:
°C
% rH
Filter Pressure Setpoint Alarm:
Pa
SCHEDULER:
Event 1
Event 2
(3)
Monday
to
to
(3)
Tuesday
to
to
(3)
Wednesday
to
to
(3)
Thursday
to
to
(3)
Friday
to
to
(3)
Saturday
to
to
(3)
Sunday
to
to
(3)
After Hours Operation Duration:
Hours
NOTE:
(3)
Only visible when Enable Scheduler is set to Yes.