Installation and Commissioning Guide - Package Commercial Unit
Doc. Part No. 0525-055 Ver. 9 220308
Installation and Commissioning Guide
Package Commercial Unit
18
PROCEDURE:
1. Slip nylon slings through the pallet as shown in Fig. 1.
2. Use a Bow or Dee shackle to connect the slings.
3. Ensure slings are protected by rubber pads or similar if slings are draped across unit edges, corners, or air grilles.
This will prevent the unit from being damaged during lifting.
4. SPREADER BAR must be used when lifting the unit. Ensure that the spreader bar is slightly larger than the base.
5. Test lift the unit to determine exact unit balance and stability before hoisting it to the installation location.
DANGER
Make sure rigging equipment, accessories and plant are sufficiently and safely capable to lift the unit in order to prevent
potential damage to property, severe personal injury or death. Check unit weight and weight distribution points on unit
drawing dimensions section.
NOTES
• Lifting procedure and unit model shown are suggestions and for illustration purposes only.
• It is highly recommended that installer observe current industry safe and sound rigging and lifting procedure.
CAUTION
Length of fork lift tines must pass the unit middle section, in order to safely carry the unit.
Fork Lift Method
Procedure:
1. To move the unit around with a forklift, insert the fork tines through the unit feet assembly, as shown in Fig. 2.
2. Only fork the unit through compressor end or side of the unit.
(See illustration for location of compressor end)
CAUTION
DO NOT LIFT from this end
COMPRESSOR
END
INSERT FORKLIFT
TINES HERE
Fig. 2