PRELIMINARY DATA ONLY Ver. 5.01 210406
THIS LABEL TO BE REMOVED ON SIGN-OFF
40
Installation and Commissioning Guide- Package Ducted Variable Capacity Commercial
Doc. Part No. 0525-067 Ver. 5 210414
Installation and Commissioning Guide
Variable Capacity Commercial
16.05. Demand Response Management (Outdoor Board)
These products are complaint to AS/NZS 4755.3.1:2012
NOTE
Third Party Control Option is not available if Demand
Response Management (DRM) is used.
CONDENSER
CPU
BOARD
DE
M
AND RE
SP
ONSE
M
ANA
GE
MENT
DRM 1 / HEAT
DRM 2 / FAN
DRM 3 / COMP
DR
M
C
ontr
ol Inputs
COM / +12V
1. Thread and Route DRM input cables into the Unit (as per previous wiring installation procedure) .
2. Connect cables into terminals (as shown above and as per wiring diagram provided with the unit).
DEMAND RESPONSE ENABLING DEVICE (DRED) CIRCUIT DIAGRAM
ODU CPU
BOARD
DEMAND RESPONSE
MANAGEMENT
DRED
AS4755 COMPLIANT DEVICE
(OPTIONAL)
DRED VOLTAGE
FREE CONTACTS
COM / +12V
DRM 1 / HEAT
DRM 2 / FAN
DRM 3 / COMP
Demand
Management
Mode
Description Of Mode
Allowable Range (%)
Operating Mode
DRM1
Compressor Off Mode
Compressor ONLY will cycle OFF and remain off for the
entire Demand Response event. All other functions will
operate as normal (i.e. Indoor Fan)
DRM2
Maximum 50% power use mode
with 0 to <50% allowable power use range
Compressor 0 to <50% operation range for the total
Demand Response event.
DRM3
Maximum 75% power use mode
with 0 to <75% allowable power use range
Compressor 0 to <75% operation range for the total
Demand Response event.