Installation and Commissioning Guide - Wall Hung Split System
Doc. No.9590-5007
Ver. 2 210416
Installation and Commissioning Guide
Wall Hung Split System
16
Step 4: Prepare refrigerant piping
The refrigerant piping is inside an insulating sleeve attached to the back of the unit. You must prepare the piping before
passing it through the hole in the wall. Refer to the
Refrigerant Piping Connection
section of this manual for detailed
instructions on pipe flaring and flare torque requirements, technique, etc.
NOTE
Refrigerant piping can exit the indoor unit from four different angles:
• Left-hand side
• Left rear
• Right-hand side
• Right rear
Move to left or right
30-50mm
30-50mm
CAUTION
Be extremely careful not to dent or damage the piping while bending them away from the unit. Any dents in the piping will
affect the unit’s operation.