background image

INTERNATIONAL

ACV international n.v

KERKPLEIN, 39
B-1601 RUISBROEK - belgium
TEL.: +32 2 334 82 20
FAX: +32 2 378 16 49
E-MAIL: international.info@acv-world.com

AUSTRALIA

ACV PACIFIC PTY.LTD

UNIT 7, 10 ANELLA AVENUE
CASTLE HILL NSW 2154 - AUSTRALIA
TEL.: +61 2 88 50 45 88
FAX: +61 2 88 50 45 99
E-MAIL: pacific.info@acv-world.com

BELGIUM

ACV  BELGIUM nv/sa

KERKPLEIN, 39
B-1601 RUISBROEK-BELGIUM
TEL.: +32 2 334 82 40
FAX: +32 2 334 82 59
E-MAIL: belgium.info@acv-world.com

CHILE

ALBIN TROTTER Y ACV LTDA

SAN PABLO 3800
QUINTA NORMAL - SANTIAGO - CHILE
TEL.:+56 2 772 01 69
FAX:+56 2 772 92 62/63
E-MAIL: chile.info@acv-world.com

CZECH REPUBLIC

ACV CR SPOL. s.r.o

NA KRECKU 365
CR-109 04 PRAHA 10 - CZECH REPUBLIC
TEL.:+420 2 720 83 341
FAX:+420 2 720 83 343
E-MAIL: ceskarepublika.info@acv-world.com

DEUTSCHLAND

ACV DEUTSCHLAND Gmbh

GEWERBEGEBIET GARTENSTRASSE
D-08132 MÜLSEN ST.JACOB - DEUTSCHLAND
TEL.:+49 37601 311 30
FAX:+49 37601 311 31
E-MAIL: deutschland.info@acv-world.com

ESPAÑA

ACV ESPAÑA

C/ANTONIO GAUDI, 3
E-08349 CABRERA DE MAR - ESPANA
TEL.:+34 937 595 451
FAX:+34 937 593 498
E-MAIL: spain.info@acv-world.com

FRANCE

ACV FRANCE sa

31, RUE AMPERE - Z.I MI - PLAINE
F-69680 CHASSIEU - FRANCE
TEL.:+33 4 72 47 07 76
FAX:+33 4 72 47 08 72
E-MAIL: france.info@acv-world.com

ITALIA

ACV ITALIA

VIA MALPIGHI 6
I-48018 FAENZA (RA) - ITALIA
TEL.:+39 0546 62 25 15
FAX:+39 0546 62 25 05
E-MAIL: italia.info@acv-world.com

NEDERLAND

ACV NEDERLAND bv

POSTBUS 350
NL-2980 AJ RIDDERKERK - NEDERLAND
TEL.:+31 180 42 10 55
FAX:+31 180 41 58 02
E-MAIL: nederland.info@acv-world.com

POLAND

ACV POLSKA sp. z.o.o.

BUIRO GLOWNE 
PL-87 - 702 KONECK - POLAND
TEL.:+48 54 272 23 00
FAX:+48 54 272 23 01
E-MAIL: polska.info@acv-world.com

PORTUGAL

BOILERNOX LDA

RUA OUTEIRO DO POMAR
CASAL DO CEGO, FRACÇÃO C,
PAVILHÃO 3 - MARRAZES
2400-402 LEIRIA - PORTUGAL
TEL.:+351 244 837 239/40
FAX:+351 244 823 758
E-MAIL: boilernox@mail.telepac.pt

RUSSIA

ACV RUSSIA

1/9, MALYI KISELNYI
103031 MOSCOW - RUSSIA
TEL.:+7 095 928 48 02 / +7 095 921 89 79
FAX:+7 095 928 08 77
E-MAIL: russia.info@acv-world.com

SLOVAK REPUBLIC

ACV SLOVAKIA s.r.o.

PLUHOVÁ 49
831 04 BRATISLAVA - SLOVAK REPUBLIC
TEL.:+421 2 444 62 276
FAX:+421 2 444 62 275
E-MAIL: slovakia.info@acv-world.com

UK

ACV UK Ltd

ST. DAVID’S BUSINESS PARK
DALGETY BAY - FIFE - KY11 9PF - SCOTLAND
TEL.:+44 1383 82 01 00
FAX:+44 1383 82 01 80
E-MAIL: uk.info@acv-world.com

USA

TRIANGLE TUBE PHASE III

FREEWAY CENTER - 1 TRIANGLE LANE
BLACKWOOD NJ 08012 - USA
TEL.:+1 856 228 8881
FAX:+1 856 228 3584
E-MAIL: sales@triangletube.com

ARGENTINA

TECNOPRACTICA

ALFEREZ BOUCHARD 4857
1605 CARAPACHAY - BUENOS AIRES
TEL.: +54 11 47 65 33 35
FAX: +54 11 47 65 43 07
E-MAIL: jchas@tecnopractica.com

BRAZIL

SIMETAL INDUSTRIA E COMERCIO
DE FERRAMENTAS LTDA

RUA GERSON ANDREIS 535
95112 - 130 CAXIAS DO SUL - BRAZIL
TEL.: +55 54 227 12 44
FAX: +55 54 227 12 26
E-MAIL: export@simetall.com.br

BULGARIA

PROXIMUS ENGINEERING LTD

7 BIAL KREM STR.
9010 VARNA - BULGARIA
TEL.:+359 52 500 070
FAX:+359 52 301 131
E-MAIL: yankod@yahoo.com

CHINA

BEIJING HUADIAN HT POWER TECHNOLOGY
DEVELOPMENT CO. LTD

ROOM B-912, TOWER B, COFCO PLAZA
N°. 8, JIANGUOMENNEI AVENUE
BEIJING 100005 - PEOPLE’S REPUBLIC OF CHINA
TEL.:+86 10 652 30 363/393 EXT 101
FAX:+86 10 652 27 071
E-MAIL: li.zheng@acv-world.com

DENMARK

VARMEHUSET

FRICHSVEJ 40 A
8600 SILKEBORG - DENMARK
TEL.:+45 86 82 63 55
FAX:+45 86 82 65 03
E-MAIL: vh@varmehuset.dk

ESTONIA

TERMOX AS

TAHE 112A
51013 TARTU - ESTONIA
TEL.:+372 736 73 39
FAX:+372 736 73 44
E-MAIL: termox@termox.ee

GREECE

ESTIAS

MARASLI STREET 7
54248 THESSALONIKI - GREECE
TEL.:+30 310 31 98 77
FAX:+30 310 31 97 22
E-MAIL: info@genikithermanseon.gr

ÎLE MAURICE

SOTRATECH

29, RUE MELDRUM
BEAU BASSIN - ÎLE MAURICE
TEL.:+230 46 76 970
FAX:+230 46 76 971
E-MAIL: stech@intnet.mu

LITHUANIA

UAB “GILIUS IR KO”

SAVARNORIU PR. 192
3000 KAUNAS - LITHUANIA
TEL.:+370 37 308 930/931
FAX:+370 37 308 932

MAROC

CASATHERM

PLACE EL YASSIR
20300 CASABLANCA - MAROC
TEL.:+212 22 40 15 23
FAX:+212 22 24 04 86

MOLDAVIA

STIMEX - PRIM S.R.L.

STR BUCURESTI, 60A
2012 CHISINAU - MOLDAVIA
TEL.:+37 32 22 46 75
FAX:+37 32 27 24 56
E-MAIL: stimex@slavik.mldnet.com

ÖSTERREICH

PROTHERM HEIZUNGSTECHNIK Gmbh

TRAUNUFERSTRASSE 113
4052 ANSFELDEN - ÖSTERREICH
TEL.:+43 7229 804 82
FAX:+43 7229 804 92
E-MAIL: protherm@nextra.at

ROMANIA

SC TRUST  EURO THERM  SA

D.N PIATRA NEAMT - ROMAN 
km 2 C.P 5 O.P 3 jud. Neamt
5600 PIATRA NEAMT - ROMANIA
TEL.:+40 233 20 62 06
FAX:+40 233 20 62 00
E-MAIL: office@eurotherm.ro

SLOVENIA

Z*MAJ d.o.o.

CESTA OF 49
1420 TRBOVLJE - SLOVENIA
TEL.:+386 356 32 830
FAX:+386 356 32 831
E-MAIL: jjeraj@zmaj.si

SWEDEN

WÄRMEPRODUKTER I KLIPPAN AB

TEMPLAREGATAN 7
26435 KLIPPAN - SWEDEN
TEL.:+46 435 184 10
FAX:+46 435 184 02
E-MAIL: warmeprodukter.se@telia.com

TUNISIE

SO.CO.ME CHAUMAX

BOÎTE POSTALE N°44
1002 TUNIS - TUNISIE
TEL.:+216 71 78 15 91
FAX:+216 71 78 87 31

UKRAINE

UKRTEPLOSERVICE LTD

PR. LAGUTENKO 14
83086 DONETSK - UKRAINE
TEL.:+38 062 382 60 47/48
FAX:+38 062 335 16 89
E-MAIL: kotel@uts.donetsk.ua

Summary of Contents for Alfa G

Page 1: ...D SERVICING INSTRUCTIONS ALFA Gaz G GP Dual application gas boiler with atmospheric burner ACV reserves the right to modality the technical specifications and components of its products without prior notice 664Y0800 05 11 2002 ...

Page 2: ...hooting 6 4 SERVICING 6 4 1 Recommendation 6 4 2 Servicing the gas boiler 6 4 3 Servicing the safety devices 6 4 4 Servicing the burner 7 4 5 Emptying the boiler 7 4 6 Spare parts 7 5 DESCRIPTION 8 5 1 Overview 8 5 2 Description of operation 8 5 3 Design features 8 6 TECHNICAL SPECIFICATION 9 6 1 Effective dimensions 9 6 2 Maximum operating conditions 9 6 3 Domestic hot water performance 10 6 4 Bo...

Page 3: ... and regulations 2 2 2 CENTRAL HEATING CONNECTION 2 2 2 1 Examples of basic circuit configurations The drain valve and safety valve must be connected to the waste water system in accordance with current regulations 1 3 way manual motorisable mixer valve 2 Safety valve pre set to 3 bar with pressure gauge 3 Circulator 4 Non return valve 5 System filling valve 6 Expansion tank 7 Room thermostat 8 AC...

Page 4: ...ent regulations 2 2 3 3 Hot water expansion tank Installing a hot water expansion tank avoids any risk of pressure surges due to water hammer 2 2 3 4 Hot water circulation If the tank is situated a long way from the point of use then installing a closed return circuit can provide a faster supply of hot water always available 2 2 3 5 Description 1 Safety unit 2 Pressure reducer 3 Thermostatic mixin...

Page 5: ...N Black B Blue R Red T Green yellow 1 2 C L1 L1 N T1 T2 N T1 T2 S3 S3 N L1 230V 50 Hz 6A M R B B O B O M T N N 8 9 7 2 6 3 5 1 10 1 2 3 4 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 bl n z br SQK 349 QAAD50 QAAD70 QAC32 QAD22 P1 B5 B9 B3 B2 P1 Y1 Y2 N B5 B9 B3 B2 B2 Water temperature detector B9 Outside temperature detector B5 Analogue digi...

Page 6: ...n the boiler room by the electrician 1 2 3 4 1 RECOMMENDATION ACV recommends that boilers should be serviced at least once a year The burner must be serviced and tested by a competent engineer 4 2 SERVICING THE GAS BOILER 1 Switch off the power at the mains switch outside the boiler and close the gas tap 2 Set the on off switch on the control panel to the OFF position 3 Release and remove the chim...

Page 7: ... When the boiler is empty return the isolating and safety valves to their initial positions 4 5 2 EMPTYING THE HOT WATER TANK 1 Switch off the mains power to the boiler at the external switch installed by the electrician 2 Relieve the pressure in the primary circuit 3 Close valves A and B 4 Open valves C and D first C then D 5 Let the water drain away 6 After emptying return the valves to their in...

Page 8: ... water Designed for connection to a chimney or suitable flue TANK IN TANK indirect storage type domestic hot water production Fittings for connecting the circulation kit to feed the heating circuit available as an option Control panel with setting thermostat 60 90 C on off switch Summer Winter selector thermometer warning lamp and burner reset button Flue gas anti backdraught safety device Deliver...

Page 9: ...24 Chimney reducing adapter 5 DESCRIPTION 6 TECHNICAL SPECIFICATION 24 18 2 6 7 8 11 17 16 20 21 19 22 1 10 4 3 23 12 5 15 14 13 9 9 6 1 EFFECTIVE DIMENSIONS The units are delivered fully assembled tested and packed on a timber base with shockproof edges and protected by heat shrunk plastic film On reception and after unpacking check the equipment for damage For transport purposes refer to the wei...

Page 10: ... h 579 594 Operating at 80 C Initial heating time minutes 24 24 After draw off of 140 l at 45 C minutes 17 16 5 Results obtained without a thermostatic mixing valve and with water supply at 10 C ALFA G ALFA GP Input kW 23 23 5 Output kW 20 3 20 7 Combustion efficiency 90 7 91 3 Maintenance loss at 60 C as of rate value 1 1 Mass rate of combustion products g sec 18 19 Average CO2 8 5 9 5 Total capa...

Page 11: ...nd Open the gas tap Turn on the main switch on the control panel The burner is preset at the factory Check the supply pressure and the pressure in the burner when starting the boiler 11 Fig 17 Burner gas valve Propane gas atmospheric burner fig 19 1 Burner plug connector 2 Pot type flame holder 3 Ignition and ionisation electrode 4 Observation window 5 Injector 6 Relay 7 Reset button 8 Burner cham...

Page 12: ...nough hot water we recommend setting the thermostat 1 to its maximum value When the next heating season begins simply select Winter to reactivate the heating system 4 Thermometer item 4 Fig 20 Reads the temperature of the boiler primary circuit central heating directly 7 1 2 HEATING SYSTEM GAUGE PRESSURE Your system is fitted with a heating safety valve set to 3 bar with a pressure gauge Ensure th...

Page 13: ...the burner If the burner is not working isolate the electricity supply before attempting to reset the safety thermostat 3 Remove the circular cover on the boiler top and press the red safety thermostat button Wait until the boiler temperature is below 60 C then replace the casing front panel 4 If the burner lights replace the cover 6 If the fault persists notify the installing engineer Starting th...

Page 14: ... TUBE PHASE III FREEWAY CENTER 1 TRIANGLE LANE BLACKWOOD NJ 08012 USA TEL 1 856 228 8881 FAX 1 856 228 3584 E MAIL sales triangletube com ARGENTINA TECNOPRACTICA ALFEREZ BOUCHARD 4857 1605 CARAPACHAY BUENOS AIRES TEL 54 11 47 65 33 35 FAX 54 11 47 65 43 07 E MAIL jchas tecnopractica com BRAZIL SIMETAL INDUSTRIA E COMERCIO DE FERRAMENTAS LTDA RUA GERSON ANDREIS 535 95112 130 CAXIAS DO SUL BRAZIL TE...

Reviews: