2.2.2.2

ACV circulation kit

ACV offers an optional pre-assembled circulation kit comprising:
- a circulator.
- a 3-way manual motorisable valve.
- connecting pipes including a second optional circuit.
- two isolating valves.
- adapters for mounting expansion tank, safety valve and filling

valve to right or left.

2.2.2.3

Discharge

The drain valve and safety valve must be connected to the waste
water system in accordance with current regulations.

2.2.3

DOMESTIC HOT WATER CONNECTION

2.2.3.1

Pressure reducer

If the water mains pressure is greater than 6 bar, a pressure
reducer calibrated to 4.5 bar must be fitted.

2.2.3.2

Safety unit

The tank safety unit must be ACV approved and calibrated to 7 bar.
The valve discharge must be connected to the waste water
system in accordance with current regulations.

2.2.3.3

Hot water expansion tank

Installing a hot water expansion tank avoids any risk of pressure
surges due to water-hammer.

2.2.3.4

Hot water circulation

If the tank is situated a long way from the point of use, then
installing a closed return circuit can provide a faster supply of
hot water always available.

2.2.3.5

Description

1. Safety unit
2. Pressure reducer
3. Thermostatic mixing valve
4. Hot water circulator
5. Non-return valve
6. Hot water expansion tank
7. Inlet valve
8. Draw-off valve
9. Bleed valve

IMPORTANT
As a safety measure against burns, we strongly advise
installing a thermostatic mixing valve (recommended
temperature: 60° C).

Optional fittings available

2

INSTALLATION

Fig. 5a: Configuration without thermostatic mixing valve

1

2

4

6

5

7

9

8

1

2

3

4

6

5

7

9

8

Fig. 5b: Configuration with thermostatic mixing valve

4

Fig. 4: ACV circulation kit assembly

Safty unit

Ø 3/4”

Pressure reducer

Ø 3/4”

Thermostatic mixer

Ø 3/4”

Hot water expansion tank

5 litres

Summary of Contents for Alfa G

Page 1: ...D SERVICING INSTRUCTIONS ALFA Gaz G GP Dual application gas boiler with atmospheric burner ACV reserves the right to modality the technical specifications and components of its products without prior notice 664Y0800 05 11 2002 ...

Page 2: ...hooting 6 4 SERVICING 6 4 1 Recommendation 6 4 2 Servicing the gas boiler 6 4 3 Servicing the safety devices 6 4 4 Servicing the burner 7 4 5 Emptying the boiler 7 4 6 Spare parts 7 5 DESCRIPTION 8 5 1 Overview 8 5 2 Description of operation 8 5 3 Design features 8 6 TECHNICAL SPECIFICATION 9 6 1 Effective dimensions 9 6 2 Maximum operating conditions 9 6 3 Domestic hot water performance 10 6 4 Bo...

Page 3: ... and regulations 2 2 2 CENTRAL HEATING CONNECTION 2 2 2 1 Examples of basic circuit configurations The drain valve and safety valve must be connected to the waste water system in accordance with current regulations 1 3 way manual motorisable mixer valve 2 Safety valve pre set to 3 bar with pressure gauge 3 Circulator 4 Non return valve 5 System filling valve 6 Expansion tank 7 Room thermostat 8 AC...

Page 4: ...ent regulations 2 2 3 3 Hot water expansion tank Installing a hot water expansion tank avoids any risk of pressure surges due to water hammer 2 2 3 4 Hot water circulation If the tank is situated a long way from the point of use then installing a closed return circuit can provide a faster supply of hot water always available 2 2 3 5 Description 1 Safety unit 2 Pressure reducer 3 Thermostatic mixin...

Page 5: ...N Black B Blue R Red T Green yellow 1 2 C L1 L1 N T1 T2 N T1 T2 S3 S3 N L1 230V 50 Hz 6A M R B B O B O M T N N 8 9 7 2 6 3 5 1 10 1 2 3 4 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 bl n z br SQK 349 QAAD50 QAAD70 QAC32 QAD22 P1 B5 B9 B3 B2 P1 Y1 Y2 N B5 B9 B3 B2 B2 Water temperature detector B9 Outside temperature detector B5 Analogue digi...

Page 6: ...n the boiler room by the electrician 1 2 3 4 1 RECOMMENDATION ACV recommends that boilers should be serviced at least once a year The burner must be serviced and tested by a competent engineer 4 2 SERVICING THE GAS BOILER 1 Switch off the power at the mains switch outside the boiler and close the gas tap 2 Set the on off switch on the control panel to the OFF position 3 Release and remove the chim...

Page 7: ... When the boiler is empty return the isolating and safety valves to their initial positions 4 5 2 EMPTYING THE HOT WATER TANK 1 Switch off the mains power to the boiler at the external switch installed by the electrician 2 Relieve the pressure in the primary circuit 3 Close valves A and B 4 Open valves C and D first C then D 5 Let the water drain away 6 After emptying return the valves to their in...

Page 8: ... water Designed for connection to a chimney or suitable flue TANK IN TANK indirect storage type domestic hot water production Fittings for connecting the circulation kit to feed the heating circuit available as an option Control panel with setting thermostat 60 90 C on off switch Summer Winter selector thermometer warning lamp and burner reset button Flue gas anti backdraught safety device Deliver...

Page 9: ...24 Chimney reducing adapter 5 DESCRIPTION 6 TECHNICAL SPECIFICATION 24 18 2 6 7 8 11 17 16 20 21 19 22 1 10 4 3 23 12 5 15 14 13 9 9 6 1 EFFECTIVE DIMENSIONS The units are delivered fully assembled tested and packed on a timber base with shockproof edges and protected by heat shrunk plastic film On reception and after unpacking check the equipment for damage For transport purposes refer to the wei...

Page 10: ... h 579 594 Operating at 80 C Initial heating time minutes 24 24 After draw off of 140 l at 45 C minutes 17 16 5 Results obtained without a thermostatic mixing valve and with water supply at 10 C ALFA G ALFA GP Input kW 23 23 5 Output kW 20 3 20 7 Combustion efficiency 90 7 91 3 Maintenance loss at 60 C as of rate value 1 1 Mass rate of combustion products g sec 18 19 Average CO2 8 5 9 5 Total capa...

Page 11: ...nd Open the gas tap Turn on the main switch on the control panel The burner is preset at the factory Check the supply pressure and the pressure in the burner when starting the boiler 11 Fig 17 Burner gas valve Propane gas atmospheric burner fig 19 1 Burner plug connector 2 Pot type flame holder 3 Ignition and ionisation electrode 4 Observation window 5 Injector 6 Relay 7 Reset button 8 Burner cham...

Page 12: ...nough hot water we recommend setting the thermostat 1 to its maximum value When the next heating season begins simply select Winter to reactivate the heating system 4 Thermometer item 4 Fig 20 Reads the temperature of the boiler primary circuit central heating directly 7 1 2 HEATING SYSTEM GAUGE PRESSURE Your system is fitted with a heating safety valve set to 3 bar with a pressure gauge Ensure th...

Page 13: ...the burner If the burner is not working isolate the electricity supply before attempting to reset the safety thermostat 3 Remove the circular cover on the boiler top and press the red safety thermostat button Wait until the boiler temperature is below 60 C then replace the casing front panel 4 If the burner lights replace the cover 6 If the fault persists notify the installing engineer Starting th...

Page 14: ... TUBE PHASE III FREEWAY CENTER 1 TRIANGLE LANE BLACKWOOD NJ 08012 USA TEL 1 856 228 8881 FAX 1 856 228 3584 E MAIL sales triangletube com ARGENTINA TECNOPRACTICA ALFEREZ BOUCHARD 4857 1605 CARAPACHAY BUENOS AIRES TEL 54 11 47 65 33 35 FAX 54 11 47 65 43 07 E MAIL jchas tecnopractica com BRAZIL SIMETAL INDUSTRIA E COMERCIO DE FERRAMENTAS LTDA RUA GERSON ANDREIS 535 95112 130 CAXIAS DO SUL BRAZIL TE...

Reviews: