EN • 3
664Y4200 • F
E
N
FR
R
U
P
L
DE
IT
ES
N
L
InstallatIon
17
Flue connection
17
Prestige Solo DHW conn Smart cylinder
19
Prestige Excellence DHW connection
20
Central heating connection
21
Gas connection
21
Installation of a single heating circuit with regulation by ACV 22 room thermostat.
22
Installing a single heating circuit regulated by the Room Unit
24
Installation of high and low temperature heating circuits of 14 kW maximum power with regulation by room-Unit + ZMC-2 of 230 Volts
26
Propane conversion
28
commIssIonIng and maIntenance
30
Commissioning of the installation
30
Boiler maintenance
30
Resistance of the temperature sensors
30
Front panel removal
31
Disassembling and inspecting the electrode
31
Dismantling the burner
32
Burner thread torque chart
32
Accessory removal
33
Dismantling the exchanger
33
Cleaning the exchanger
33
esYs parameters for the specIalIst
34
Code mode
34
Communication mode
35
Parameter mode
36
Test Mode
38
Error Mode
39
Info mode
40
esYs errors and blockIng codes
42
List of error codes + solutions
42
Index