USER’S MANUAL
V-line 899x.xxx/LPG HYBRID
1
1.
IMPORTANT NOTICE
The instructions for attendance, maintenance and installation serve the user to gain information on the
design, correct attendance, maintenance and safe installation.
The information included in the present instructions are mandatory and the manufacturer does not accept
any responsibility for any damage due to their non-observance.
The dispenser is complicated equipment providing many important functions.
Prior to putting into operation tanks and the piping system shall be cleaned and fuel purity shall be
checked. Also el. power distribution and correct wiring shall be inspected to prevent injury by el.
current and to provide explosion proofness – fuels are flammable liquids of the 1
st
and 2
nd
danger
class!
The manufacturer tests each dispenser considering the function, safety and metrology. Each delivery shall
include the instructions for attendance, maintenance and installation, EC declaration of conformity and a
service book identifying dispenser components. The dispenser, produced with high precision and care,
secures reliable and safe operation. Principal safety regulations protecting the user against injury shall be
kept during operation and maintenance and the dispenser shall be prevented from damage. No
modifications of the dispenser equipment are allowed without producer’s written approval.
The dispenser has been designed for outdoor installation – class according to OIML D11 – C (outdoor -
stationary).
Important instructions for installation and operation:
a)
Only qualified and trained staff of a service company can perform service and installation.
Service procedures shall be performed in compliance with the operation regulations of the
filling station. The manufacturer is not responsible for damages due to the incompetence of
the staff.
b)
Prior to proceed to the dispenser handling, study these Operating User’s manual and other
manufacturer’s documents belonging to the dispenser accessories carefully.
c)
Check the dispenser delivery for completeness and in the case of any discrepancy or damage,
inform supplier or the manufacturer without delay.
d)
Ensure the proper storage of the dispenser in a dry and protected room for the pre-installing
period.
e)
Prior to installation, check the dispenser for the completeness of the filling station technology
against the valid project, and revise the connecting dimensions of the base frame including the
outlet of the piping system.
f)
Rinse the technological equipment (piping systems) through the filtering device and continue
rinsing until the filtering device remains free of impurities.
g)
With respect to operating safety it is necessary at dispenser installation situate with
connection of dispensing hose in the direction of exit from the filling station.
h)
The module requires the connection of the vapour return piping of min. DIN 16 – we
recommend DN 25.
i)
The dispenser requires the connection to the return piping of a DN 16 (1/2“) inner diameter.
j)
Connect the dispenser electrical equipment and revise it.
k)
Carry out the pressure test of the dispenser including its piping systems with a 2,5 MPa pressure
and revise it.
l)
For putting the dispenser into operation, proceed in accordance with the point 17.
m)
Carry out the test for proper function and entrust the metrological verification to a metrological
authority representative.
n)
On meeting all of these requirements and after the approval by the representatives of the
metrological authority, the standard operation may start.
ATTENTION!
The dispenser shall not be installed in an explosion danger zone 0, 1, 2 in compliance with zones
specified in the EN 60079-10-1!