CAUTION
Make sure that all flasher heads are connected to the equipments in a logical order. For example, the first
flasher head is the one that is furthest away from the runway. If the system has RTILs or REILs, those must be
closest to the runway and must have the highest logical address.
Set the number of flasher heads and equipment cabinets
.
13. Start the software. See §
.
14. Go to the menu Layout .
15. Set the number of flasher heads. Include the RTILS or REILs, if applicable .
16. Set the number of equipment cabinets (boxes)
Set the flashing system layout
17. Set a flashing sequence and a slave number for each flasher head. Preferably work in a logical order: set the sequence
number equal to the slave number and set the the first flasher head in the flashing system to 1 .
18. Set some of the flasher heads to be REILs or RTILs, if applicable. Click the field after th e sequence number.
Note
All flasher heads for the REILS or RTILS flasher heads need an individual unique sequence number.
Upload the changes
19. Press Program . The software now sends the changes to the LMC.
Flashing System Maintenance
Commissioning
24
Copyright
©
ADB Safegate, All Rights Reserved
Summary of Contents for FCU-1-in-1
Page 2: ......
Page 8: ...Flashing System Maintenance TABLE OF CONTENTS viii Copyright ADB Safegate All Rights Reserved ...
Page 18: ...Flashing System Maintenance Safety 8 Copyright ADB Safegate All Rights Reserved ...
Page 28: ...Flashing System Maintenance Introduction 18 Copyright ADB Safegate All Rights Reserved ...
Page 42: ...Flashing System Maintenance Commissioning 32 Copyright ADB Safegate All Rights Reserved ...
Page 64: ...Flashing System Maintenance Maintenance 54 Copyright ADB Safegate All Rights Reserved ...
Page 106: ...Flashing System Maintenance Technical data 96 Copyright ADB Safegate All Rights Reserved ...
Page 110: ......