Disconnect - 2
5. Remove the Local bus connection board (A). See §
6. Remove the terminal stopper (B).
7. Remove the two screws (D) .
8. Remove the rail (C).
9. Disconnect the cables:
•
Fuses F1 and F2 (7 cables) (E);
•
Heater (cut the two soldered connections) (F);
Replace
10. Remove the wiring assembly.
11. Install the new wiring assembly. Maintenance
Connect - 1
12. Connect the seven cables of the fuses F1 and F2.
Connect heater cables
13. Slide thermo-retractable insulation sleeves on the cables;
14. Solder one cable on the connection point (A) on both sides of the heater;
UM-4019_AM02-620e, Rev. 3.0, 2020/05/12
47
Copyright
©
ADB Safegate, All Rights Reserved
Summary of Contents for FCU-1-in-1
Page 2: ......
Page 8: ...Flashing System Maintenance TABLE OF CONTENTS viii Copyright ADB Safegate All Rights Reserved ...
Page 18: ...Flashing System Maintenance Safety 8 Copyright ADB Safegate All Rights Reserved ...
Page 28: ...Flashing System Maintenance Introduction 18 Copyright ADB Safegate All Rights Reserved ...
Page 42: ...Flashing System Maintenance Commissioning 32 Copyright ADB Safegate All Rights Reserved ...
Page 64: ...Flashing System Maintenance Maintenance 54 Copyright ADB Safegate All Rights Reserved ...
Page 106: ...Flashing System Maintenance Technical data 96 Copyright ADB Safegate All Rights Reserved ...
Page 110: ......