15. Slide the insulation sleeve over the solder points.
Connect - 3
16. Install the rail.
17. Install the two screws.
18. Install the Local bus connection board (A). See §
.
19. Install the terminal stopper (B).
20. Connect the cables:
•
Power input terminals and protective earth terminals (C);
•
FCU PCB (connectors P7, P6 and P5) (D);
•
DC power supply (input wires) (E);
•
Multiwire PCB (J1) (F).
21. Bind the cables. Use cable binders.
22. Close the cabinet door.
FCU-3
Disconnect - 1
23. Make sure that all power to the equipment is OFF. See §
Prepare: Switch OFF power supply
24. Disconnect the cables:
•
Power input terminals L1, L2 and L3 and protective earth terminals (A);
•
FCU 1 PCB (connectors P7, P6 and P5) (B);
•
FCU 2 PCB (connectors P6 and P5) (C);
•
FCU 3 PCB (connector P5) (D);
•
DC power supply (input wires) (E);
•
Local bus connection board (F);
•
Multiwire PCB (J1) (G).
Flashing System Maintenance
Maintenance
48
Copyright
©
ADB Safegate, All Rights Reserved
Summary of Contents for FCU-1-in-1
Page 2: ......
Page 8: ...Flashing System Maintenance TABLE OF CONTENTS viii Copyright ADB Safegate All Rights Reserved ...
Page 18: ...Flashing System Maintenance Safety 8 Copyright ADB Safegate All Rights Reserved ...
Page 28: ...Flashing System Maintenance Introduction 18 Copyright ADB Safegate All Rights Reserved ...
Page 42: ...Flashing System Maintenance Commissioning 32 Copyright ADB Safegate All Rights Reserved ...
Page 64: ...Flashing System Maintenance Maintenance 54 Copyright ADB Safegate All Rights Reserved ...
Page 106: ...Flashing System Maintenance Technical data 96 Copyright ADB Safegate All Rights Reserved ...
Page 110: ......