Install
6. Install the new connector board. Push the connector board on the rail .
7. Connect the earth wire. The earth wire has a clip-on connection .
8. Connect the connectors on the local bus connection board (A). Connect the cables in the same way as in the old connection
board .
9. Close the cabinet door.
5.2.13 Wiring assembly
FCU-1
Disconnect - 1
1. Make sure that all power to the equipment is OFF. See §
Prepare: Switch OFF power supply
2. Remove the cover. See §
3. Disconnect the cables:
•
Power input terminals and protective earth terminals (A);
•
FCU PCB (connectors P7, P6 and P5) (B);
•
DC power supply (input wires) (C);
•
Multiwire PCB (J1) (D).
4. Remove the cable binders from the disconnected cables.
Flashing System Maintenance
Maintenance
46
Copyright
©
ADB Safegate, All Rights Reserved
Summary of Contents for FCU-1-in-1
Page 2: ......
Page 8: ...Flashing System Maintenance TABLE OF CONTENTS viii Copyright ADB Safegate All Rights Reserved ...
Page 18: ...Flashing System Maintenance Safety 8 Copyright ADB Safegate All Rights Reserved ...
Page 28: ...Flashing System Maintenance Introduction 18 Copyright ADB Safegate All Rights Reserved ...
Page 42: ...Flashing System Maintenance Commissioning 32 Copyright ADB Safegate All Rights Reserved ...
Page 64: ...Flashing System Maintenance Maintenance 54 Copyright ADB Safegate All Rights Reserved ...
Page 106: ...Flashing System Maintenance Technical data 96 Copyright ADB Safegate All Rights Reserved ...
Page 110: ......