Check at brightness steps 2 and 3
4. Repeat the procedure with the rotary switch of the LMC in positions 2 and 3.
7.7 Measure power draw
Measure power draw on power supply that feeds flashing system
1. Measure the current on all phases. Use a True RMS current clamp.
2. Check the current:
•
For an equal number of units distributed over the 3 phases, make sure the current is less than 1 A RMS;
•
If there is a loading difference between the phases, make sure that it is less than 2.5 A RMS.
UM-4019_AM02-620e, Rev. 3.0, 2020/05/12
63
Copyright
©
ADB Safegate, All Rights Reserved
Summary of Contents for FCU-1-in-1
Page 2: ......
Page 8: ...Flashing System Maintenance TABLE OF CONTENTS viii Copyright ADB Safegate All Rights Reserved ...
Page 18: ...Flashing System Maintenance Safety 8 Copyright ADB Safegate All Rights Reserved ...
Page 28: ...Flashing System Maintenance Introduction 18 Copyright ADB Safegate All Rights Reserved ...
Page 42: ...Flashing System Maintenance Commissioning 32 Copyright ADB Safegate All Rights Reserved ...
Page 64: ...Flashing System Maintenance Maintenance 54 Copyright ADB Safegate All Rights Reserved ...
Page 106: ...Flashing System Maintenance Technical data 96 Copyright ADB Safegate All Rights Reserved ...
Page 110: ......