11. To start an automatic parameter download, click Download Parameters.
12. Click Continue to confirm parameter download.
13. The SCM unit should now sound and configuration progress information appear in the log at the bottom of the window.
Note
If there is no sound from the SCM during configuration, check settings for example COM port or cables.
14. When downloading the parameters is complete, a checksum check is performed to ensure the RELIANCE IQ has received
the new parameters without fault. If the unit without fault, click OK and the unit is now ready to use.
15. Disconnect the RELIANCE IQ product cable.
16. Turn off the SCM, LPC for at least 30 seconds to fully power down the RELIANCE IQ or when no more RELIANCE IQ
products are to be configured.
17. Turn on the LPC to power up the RELIANCE IQ, for example an RGL set to flash as default, should flash.
UM-0210, Rev. 2.0, 2020/04/30
23
Copyright
©
ADB Safegate, All Rights Reserved
Summary of Contents for RELIANCE AC
Page 2: ......
Page 8: ...RELIANCE Inset Lights List of Figures viii Copyright ADB Safegate All Rights Reserved ...
Page 10: ...RELIANCE Inset Lights List of Tables x Copyright ADB Safegate All Rights Reserved ...
Page 20: ...RELIANCE Inset Lights Introduction 10 Copyright ADB Safegate All Rights Reserved ...
Page 46: ...RELIANCE Inset Lights Spare Parts 36 Copyright ADB Safegate All Rights Reserved ...
Page 48: ...RELIANCE Inset Lights INTEROPERABILITY 38 Copyright ADB Safegate All Rights Reserved ...
Page 52: ...RELIANCE Inset Lights CABLE LOSS 42 Copyright ADB Safegate All Rights Reserved ...
Page 55: ...UM 0210 Rev 2 0 2020 04 30 45 Copyright ADB Safegate All Rights Reserved ...
Page 56: ......