ADCP-80-353 • Issue 2 • August 2002 • Section 2: Installation
Page 2-6
©
2002, ADC Telecommunications, Inc.
When
bringing the cables into the bay, make sure that all cables carrying digital signals away
from
the bay are run vertically along the right side of the bay (as viewed from the front), and all
cables
carrying signals to the bay are run vertically along the left side. The cables should be run
in
the rack duct and attached to appropriate cable tie brackets in the duct using nylon tie-wraps
or
cable lacing. Any cables not contained in the duct should be secured to the cable brackets on
the
rear of the bay. If the cables are coming into the bay from above, cable attachment should
start
at the bottom and work up (refer to
).
Figure 2-4. Cable Routing from Top to Bottom
SPACER
OR
FILLER KIT
NETWORK
ELEMENT
CABLES
8656-A