Project Member Signatures
LTPH-SM-1052-04
88
July 14, 2002
HMS-358 List 5 and List 6
I
NSTALLATION
V
ERIFICATION
BY
S
ECTION
Reviewed Installation Plans
“Reviewing Installation Plans” on page 4
Check
ü
if not applicable
H
Established Method of Procedure
“Establishing a Method of Procedure” on page 4
)
Check
ü
if not applicable
H
Unpacked and Inspected System Components
“Unpacking and Inspecting the System Components” on page 5
Check
ü
if not applicable
H
Verified Presence of Proper Tools and Supplies
Check
ü
if not applicable
H
Reviewed Safety Precautions
“Safety Warnings and Notices” on page v
Check
ü
if not applicable
H
Mounted Chassis
“Mounting the Chassis” on page 6
Check
ü
if not applicable
H
Installed LIU Module B
“Cabling the Chassis” on page 8
)
Check
ü
if not applicable
H
Shift Supervisor Signature
?
Date
Shift Supervisor Signature
?
Date
Shift Supervisor Signature
?
Date
Shift Supervisor Signature
?
Date
Shift Supervisor Signature
?
Date
Shift Supervisor Signature
?
Date
Shift Supervisor Signature
?
Date
#
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|