LTPH-SM-1052-04
Installing
Multiplexers
HMS-358 List 5 and List 6
July 14, 2002
57
P
LACING
THE
L
INE
IN
S
ERVICE
After the line installation is complete, the line must be placed in service by:
•
enabling the alarms on the HLU
•
placing the DS1 interface in service at the HXU
Placing the HLU Under HMU Management
Step
Procedure
Installer Check
ü
The following procedure assumes proper TAO login.
For proper login procedure, please refer to
“Using the Terminal Access Option” on
1
From the Network Status screen, type the number of the desired shelf (1 through 32) and then press
.
H
2
From the Shelf Status screen, press
to select Alarm Management.
H
3
Type the slot number of the line unit you want to enable.
H
4
Press an appropriate
or
response for the alarm setting you are changing.
H
5
Proceed to
“Placing the Line Unit in Service at the HXU” on page 58
H
Installer Signature
?
Date
If an HLU card is hot-swapped while under HMU management, no setup is required. All
configuration settings are automatically downloaded from the HMU.
If the HMU is managing the line unit, only the HMU maintenance terminal (ASCII terminal or PC
running a terminal emulation program) can configure the line unit.
Removal of the HMU from the chassis enables the front panel craft port on the HLU.
When an HMU is replaced, the new HMU rebuilds its configuration database from the active
line units.
ENTER
A
Y
N