ADCP-80-575 • Issue 2 • December 2006
Page 16
© 2006, ADC Telecommunications, Inc.
3. Re-install the fuse holder (with working fuse).
4. Connect one test probe to the BATT (–) terminal on the input power terminal block.
5. Connect the other test probe to the BATT terminal on the output power terminal block.
6. Verify that continuity exists between the specified terminals.
7. Repeat the test procedure for the second fuse type, if present.
8. Repeat the test procedure for the second power bus, if present.
Figure 8. Test 2: Input Battery to Output Battery (Type 1 Fuse)
Figure 9. Test 2: Input Battery to Output Battery (Type 2 Fuse)
Test 3: Input Return to Output Return
—Do the following test for each input power position
and fuse type (refer to
and
1. Connect one test probe to the input power RTN (+) terminal
2. Connect the other test probe to the RTN terminal on the output power terminal block.
3. Verify that continuity exists between the specified terminals.
Note:
When done, remove the working fuse from the fuse holder following completion of
this test and reinstall an empty fuse holder in each fuse holder position.
18872-A
TE
S
T 2- POWER BU
S
B:
VERIFY THAT CONTINUITY
EXI
S
T
S
BETWEEN INPUT
AND TYPE 1 FU
S
ED OUTPUT
BATT TERMINAL
S
TE
S
T 2- POWER BU
S
A:
VERIFY THAT CONTINUITY
EXI
S
T
S
BETWEEN INPUT
AND TYPE 1 FU
S
ED OUTPUT
BATT TERMINAL
S
TE
S
T 3- POWER BU
S
B:
VERIFY THAT CONTINUITY
EXI
S
T
S
BETWEEN INPUT
AND TYPE 2 FU
S
ED OUTPUT
BATT TERMINAL
S
TE
S
T 3- POWER BU
S
A:
VERIFY THAT CONTINUITY
EXI
S
T
S
BETWEEN INPUT
AND TYPE 2 FU
S
ED OUTPUT
BATT TERMINAL
S
18873-A
Summary of Contents for PowerWorx Power Distribution
Page 39: ......
Page 40: ...i www adc com ...