CHAPTER 3
95
•
times - to force an internet connection to be etablished
at specific times:
Figure 85. PPP Configuration - Job scheduling - Mode - Times
Job status
“Job status” allows you to check the time and the result of the last
PPP network connection set-up:.
Figure 86. PPP Configuration - Job status
•
Last run - displays the time of the last PPP network connection
set-up;
•
Last result - displays the result of the last connection set-up;
•
Next run - displays the time of the next planned connection
set-up with the PPP network.
Job dependent settings
Allow you to determine that, in case of successful connection to
the internet, a message has to be forwarded to the address
enlisted in the tree window “Notification Sending”.
Summary of Contents for A850
Page 92: ...CHAPTER 3 Configuring the Gateway 92 Figure 81 PPP Configuration Window ...
Page 128: ...CHAPTER 3 Configuring the Gateway 128 Figure 132 Dialup Modem Window ...
Page 164: ...CHAPTER 3 Configuring the Gateway 164 ...
Page 177: ...CHAPTER 4 Sensor Type Configuration 177 Figure 183 Sensor type Window Analog ...
Page 196: ...CHAPTER 4 Using the Gateway 196 Figure 216 Sensor type Window LC ...
Page 200: ...CHAPTER 4 Using the Gateway 200 Figure 222 Sensor type Window OC ...
Page 204: ...CHAPTER 4 Using the Gateway 204 Figure 228 Sensor type Window SDI ...
Page 215: ...CHAPTER 4 Logs 215 Figure 241 System Log Selection Log types Figure 242 System Log Log types ...
Page 275: ...CHAPTER 4 RTU Network Configuration 275 Sensor details Figure 319 Sensor details Window ...
Page 366: ...CHAPTER 6 Appendix 366 ...