Adept CC Controller
54
A.4 Operation
Installing End Effectors
The fifth-axis end-effector tool flange will accept any "flat-back" end
effector compatible with the standard Adept flange (see Figure A-1). The
end effector can either be bolted on or secured with the standard Adept
ring clamp. A 1.749" diameter by 0.100" high alignment pad on the end
effector is accommodated, but any utilities must be side ported.
The fifth axis includes two air line fittings and a user electrical receptacle
for interfacing to end-of-arm tooling, see Figure A-1.
Figure A-1. Fifth-Axis End Effector Mounting Details
Summary of Contents for AdeptThree
Page 1: ...AdeptThree Robot User s Guide PRELIMINARY VERSION...
Page 3: ......
Page 8: ......
Page 14: ...AdeptThree User s Guide 6 NOTES...
Page 21: ...13 Figure 2 7 Joint 3 Hardstop...
Page 25: ...17 Figure 2 11 AdeptThree Robot Working Envelope...
Page 28: ...AdeptThree User s Guide 20 NOTES...
Page 31: ...23 Figure 3 1 AdeptThree with Calibration Fixture...
Page 40: ...AdeptThree User s Guide 32 Figure 3 6 Mounting Spool to Floor Installation Detail...
Page 44: ...AdeptThree User s Guide 36 Figure 3 8 Quill Flange Dimensions...
Page 50: ...AdeptThree User s Guide 42 Figure 3 11 Tower Card User Signal and Voltage Lines...
Page 54: ...AdeptThree User s Guide 46 NOTES...
Page 57: ...49 Figure 4 1 Joint 3 and Joint 4 Lubrication...
Page 60: ...AdeptThree User s Guide 52 NOTES...
Page 64: ...Adept CC Controller 56 NOTES...
Page 68: ...AdeptThree User s Guide 2...