background image

- 4 -

- 5 -

Item Description

Qty Item Description

Qty

APU

1

Fill valve flow restrictor, blue

1

Front cover

1

Rubber hose sealing washer, to 

be used with item C

1

Flexible hose, G ½ 15 mm 

compression

1

Cable tie

2

M6 screw

1

Instruction book

1

Wall mounting plate

1

A

E

C

B

D

H

G

F

I

1  IMPORTANT FACTS: 

READ BEFORE COMMENCING PUMP INSTALLATION

Water storage capacity .

1 .11  The APU Mini has a usable water volume of approximately 2 litres; the length  

 

 

of time the APU takes to pressurise a system will be dependent on the pressure  

 

 

differential between the cold fill and set pressures and also the refill rate of the tank .

1 .12

  Ensure the pumps are primed as described in the priming section before    

 

 

starting, to avoid causing damage to the pump . See Section 6 .20 Hydraulic   

 

 commissioning .

Water temperature

 

This unit is designed to pump cold water only which should not exceed the following   

 values:

1 .13  The maximum allowable water temperature is 23 

o

C (see Technical Section) .

1 .14  The minimum allowable water temperature is 4 

o

C .

Pipework - General

1 .15 

Do not drill holes or put fastenings into the APU Mini tank, this will cause    

 

 leakage .

1 .16 

Secure pipework: Ensure pipework to and from pump is independently  

 

 

 

supported & clipped to prevent forces being transferred to inlet and outlet    

 

 

branches of the unit . 

Do not secure pipework to the APU Mini, this will cause  

 

 

damage and possible leakage .

1 .17 

Flux: Solder joints must be completed and flux residues removed prior to APU  

 

 

Mini installation 

(flux damage will void any warranty) .

1 .18 

Pipework design: Care should be taken in the design of pipework runs to    

 

 

minimize the risk of air locks e .g . use drawn bends rather than 90

o

 bends .

1 .19

    DO NOT introduce solder flux to flexible hose, tank, pump or any    

 

 

 

parts manufactured from plastic .

1 .20

    DO NOT allow contact with oil or cellulose based paints, paint thinners or 

 

 

strippers, acid based descalents or aggressive cleaning agents .

1 .21

  DO NOT bend the flexible hose beyond 90

o

 .  It must be installed as  

 

 

 detailed, 

DO NOT kink . See Installation Section 4 .14 .

Plumbing installation regulations

1 .22  The plumbing installation must comply with the current water and building  

 

 regulations .

1 .23  The plumbing installation must be installed by a qualified person .

System filling

1 .24  The APU Mini is 

NOT DESIGNED TO FILL THE SYSTEM FROM EMPTY .   

 

 

 

It is only intended to top up the system after occassional water leakage .     

 

 

Systems should be filled via a dedicated filling loop .

Fig . 1

IMPORTANT:  With the appliance removed from its packaging check for any damage prior 

to installation.  If any damage is found contact ADEY

 

Commercial Ltd within 24 hours of 

receipt.

A

D

C

Front cover removed for clarity

B

E

Electrical rating 

plate & serial 

number

G

H

F

CHECKLIST

Note: 

Your product may vary slightly from the picture above.

Summary of Contents for Mini 130

Page 1: ...Installation and servicing Mini 130 230 Digital Pressurisation Unit...

Page 2: ...y be operated with the front cover in place z In the interests of electrical safety a 30 mA residual current device R C D not supplied should be installed in the supply circuit This may be part of a c...

Page 3: ...unit Do not secure pipework to the APU Mini this will cause damage and possible leakage 1 17 Flux Solder joints must be completed and flux residues removed prior to APU Mini installation flux damage...

Page 4: ...ted to avoid electrics or areas sensitive to water damage As part of the AB airgap CAT 5 fluid isolation the APU Mini has a weir type overflow on the front water will be discharged from this area in t...

Page 5: ...ached if the unit is a twin pump model the pumps run in duty standby mode the controller will alternate which pump starts first to even the wear on the pumps The manifold is fitted with a non return v...

Page 6: ...xpansion vessel 2 Isolating valves MUST be installed on the unit inlet and outlet before connection to the flexible hoses to allow the unit to be isolated if required The isolation valve on the outlet...

Page 7: ...th the current national electrical regulations and installed by a qualified person 5 12 Safety In the interests of electrical safety a 30 mA residual current device R C D not supplied should be instal...

Page 8: ...olt free contact specifically assigned for boiler chiller shut down in the event that the APU Mini detects system pressure above the Hi alarm pressure or below the Lo alarm pressure The boiler interlo...

Page 9: ...on correctly the following conditions must be met If these conditions have not been met the commissioning process should not continue z Ensure the system connection has been made into the heating chil...

Page 10: ...owly flash See Fig 20 3 Using buttons B C select the P function required 4 Press button A to enter the function 5 Using buttons B C increment the value required up and down 6 Press button A to confirm...

Page 11: ...ADEY Customer Service team on 44 0 1242 546717 Our staff are trained to help and advise you over the phone 7 OPERATION 7 11 Normal operation The Home screen will display the status of the system pres...

Page 12: ...d period of maintainance the following steps should be taken 1 Inspect the APU Mini for signs of damage 2 Check APU Mini tank for debris remove debris and clean tank if needed Debris may cause damage...

Page 13: ...ove pressure from the APU outlet and verify the displayed pressure is 0 bar Error will be displayed if the sensor signal is outside parameters Replace sensor call ADEY Sensor failure error Sensor erro...

Page 14: ...leakage Test pump operation Float valve operation x Level probe operation x Water condition x Exp vessel pre charge x Comments Service No 2 Date Engineer name Company name Tel No System pressure bar D...

Page 15: ...ed Kingdom Object of the declaration Pressurisation Unit The object of the declaration described above is in conformity with the relevant Union harmonisation legislation Machinery Directive 2006 42 EU...

Page 16: ...30 31...

Page 17: ...nfo adey com www adey com Produced from recycled material A carbon neutral company All ADEY marks are trademarks of Adey Holdings 2008 Limited Please visit adey com trademarks for a list of ADEY marks...

Reviews: