background image

System Requirements

 19

EGX-MXM-T1000

2.7

Certifications & Agencies

X

Windows Hardware Quality Lab (WHQL) certified for 
Windows 10

X

EU Reduction of Hazardous Substances (EU-RoHS)

X

Conformité Européenne (CE)

X

Federal Communications Commission (FCC)

Summary of Contents for EGX-MXM-T1000

Page 1: ...Leading EDGE COMPUTING EGX MXM T1000 NVIDIA Turing TU117 Quadro T1000 Embedded Graphics Module User s Manual Manual Rev 1 0 Revision Date July 15 2020 Part No 50 1Z327 1000...

Page 2: ...ii Revision History Leading EDGE COMPUTING Revision History Revision Release Date Description of Change s 1 0 2020 07 15 Initial release...

Page 3: ...ut of the use or inability to use the product or documentation even if advised of the possibility of such damages Environmental Responsibility ADLINK is committed to fulfill its social responsi bility...

Page 4: ...harm For more information go to www P65Warnings ca gov Trademarks Product names mentioned herein are used for identification pur poses only and may be trademarks and or registered trademarks of their...

Page 5: ...ns 3 1 3 3 Software Support 3 1 3 4 Graphics Options 3 1 4 Functional Block Diagram 4 1 5 Mechanical Layout 5 1 6 MXM Connector Pin Definitions 8 1 7 Thermal Policy 13 1 8 Unpacking Checklist 13 2 Sys...

Page 6: ...vi Table of Contents Leading EDGE COMPUTING Important Safety Instructions 21 Getting Service 23...

Page 7: ...List of Tables vii EGX MXM T1000 List of Tables Table 1 1 Graphics Module Display Options 3 Table 1 2 NVIDIA Link Display Types 3 Table 1 3 MXM Connector Pin Definitions 8 Table 1 4 Thermal Policy 13...

Page 8: ...viii List of Tables Leading EDGE COMPUTING This page intentionally left blank...

Page 9: ...ensions 5 Figure 1 3 EGX MXM T1000 Layout Top and Side Views 6 Figure 1 4 EGX MXM T1000 Layout Bottom View 7 Figure 1 5 MXM Connector 7 Figure 2 1 Power Sequencing 15 Figure 2 2 Module Power Down 16 F...

Page 10: ...x List of Figures Leading EDGE COMPUTING This page intentionally left blank...

Page 11: ...ended tem perature range of 40 C to 85 C suitable for mission critical harsh environments With its 896 CUDA core Turing GPU the EGX MXM T1000 supports 4 FHD displays delivering the latest lead ing edg...

Page 12: ...ing CUDA Support 896 CUDA cores 2 6 TFLOPS SP Peak CUDA Toolkit 8 0 CUDA Compute version 6 1 OpenCL 1 2 DirectX 12 OpenGL 4 5 Vulcan 1 0 Memory GDDR6 Memory 4GB 6Gbps Configuration 256Mb x32 Bandwidth...

Page 13: ...le 1 1 Graphics Module Display Options Table 1 2 NVIDIA Link Display Types DisplayPort X 1 2 1 3 1 4 X Max pixel clock 1050 MP s X Max bandwidth 25 9 GB s connector HDMI 2 0 Max resolution 4096 x 2160...

Page 14: ...am NVIDIA Quadro T1000 GPU MXM 3 1 Connector IFPC IFPB PCIe x16 Gen3 PCIe IFPA I2C Power Management PWR_EN PWR_GOOD WAKE PM JTAG GDDR6 x32 GDDR6 Channel A memory down GDDR6 x32 memory down GDDR6 x32 G...

Page 15: ...Introduction 5 EGX MXM T1000 1 5 Mechanical Layout Figure 1 2 EGX MXM T1000 Dimensions NOTE NOTE All dimensions shown are in mm 82 70...

Page 16: ...20 67 8 63 23 24 39 34 28 50 31 25 14 21 36 35 64 43 16 75 24 28 38 22 45 75 B C D B C C C Top Side 1 20 2 10 0 85 A 45 10 0 18 A Section Scale 2 1 6 3 20 B Section Scale 2 1 PTH Hole 2 pcs 3 20 6 C S...

Page 17: ...Figure 1 4 EGX MXM T1000 Layout Bottom View Figure 1 5 MXM Connector 3 10 2x4 82 2 35 1 85 129x0 35 0 0 28 75 31 34 74 39 76 E B B C C C C Bottom Side Pin 281 R G5 X G6 Pin 133 Pin 125 Pin 134 Pin 124...

Page 18: ...8 PWR_EN 9 5V 10 27MHZ_REF 11 GND 12 GND 13 GND 14 RSVD 15 GND 16 RSVD 17 GND 18 PWR_LEVEL 100K PU to 3 3V 19 RSVD 20 TH_OVERT 100K PU to 3 3V 21 RSVD 22 TH_ALERT 100K PU to 3 3V 23 RSVD 24 RSVD 25 R...

Page 19: ...ND 72 PEX_TX11 73 PEX_RX11 74 PEX_TX11 75 PEX_RX11 76 GND 77 GND 78 PEX_TX10 79 PEX_RX10 80 PEX_TX10 81 PEX_RX10 82 GND 83 GND 84 PEX_TX9 85 PEX_RX9 86 PEX_TX9 87 PEX_RX9 88 GND 89 GND 90 PEX_TX8 91 P...

Page 20: ...132 KEY 133 GND 134 GND 135 PEX_RX2 136 PEX_TX2 137 PEX_RX2 138 PEX_TX2 139 GND 140 GND 141 PEX_RX1 142 PEX_TX1 143 PEX_RX1 144 PEX_TX1 145 GND 146 GND 147 PEX_RX0 148 PEX_TX0 149 PEX_RX0 150 PEX_TX0...

Page 21: ...194 RSVD 195 RSVD 196 RSVD 197 GND 198 GND 199 DP_C_L0 200 RSVD 201 DP_C_L0 202 RSVD 203 GND 204 GND 205 DP_C_L1 206 DP_D_L0 207 DP_C_L1 208 DP_D_L0 209 GND 210 GND 211 DP_C_L2 212 DP_D_L1 213 DP_C_L2...

Page 22: ...251 GND 252 DP_B_L1 253 DP_A_L0 254 DP_B_L1 255 DP_A_L0 256 GND 257 GND 258 DP_B_L2 259 DP_A_L1 260 DP_B_L2 261 DP_A_L1 262 GND 263 GND 264 DP_B_L3 265 DP_A_L2 266 DP_B_L3 267 DP_A_L2 268 GND 269 GND...

Page 23: ...erials for inspection Obtain authorization from your dealer before returning any product to ADLINK Ensure that the fol lowing items are included in the package X EGX MXM T1000 embedded graphics module...

Page 24: ...14 Introduction Leading EDGE COMPUTING This page intentionally left blank...

Page 25: ...Resume from S3 and S4 this sequence must be followed Figure 2 1 Power Sequencing 2 2 Module Power Up and Down Issuing the PWR_EN signal powers the MXM module down and the system designer can decide wh...

Page 26: ...odule Power Down 2 3 Reset Requirements Figure 2 3 Reset Sequencing MODULE INPUT POWER PWR_EN MODULE INTERNAL POWER PWR_GOOD TPVPERL TPERST PG TPERST CLK TFAIL TPVPERL PV TPERST CLK V TPERST PG V TFAI...

Page 27: ...upport and Options on page 3 The system requires a switch circuit to determine whether the AUX or DDC signal is output from the MXM module and AC coupling capacitors should be placed on the sys tem bo...

Page 28: ...to the ground on the DP lanes must placed on the DVI HDMI connector side of the AC cou pling gated by a MOSFET to limit leakage Figure 2 5 DVI HDMI on DisplayPort Interface 2 6 Driver Installation Dri...

Page 29: ...19 EGX MXM T1000 2 7 Certifications Agencies X Windows Hardware Quality Lab WHQL certified for Windows 10 X EU Reduction of Hazardous Substances EU RoHS X Conformit Europ enne CE X Federal Communicat...

Page 30: ...20 System Requirements Leading EDGE COMPUTING This page intentionally left blank...

Page 31: ...mperature of 50 C X When installing mounting or uninstalling removing device or when removal of a chassis cover is required for user ser vicing Z Turn off power and unplug any power cords cables Z Rei...

Page 32: ...re loosening the thumbscrews and always fasten the thumbscrews with a screwdriver before starting the system up X It is recommended that the device be installed only in a server room or computer room...

Page 33: ...408 360 0200 Toll Free 1 800 966 5200 USA only Fax 1 408 360 0222 Email info adlinktech com ADLINK Technology China Co Ltd 300 Fang Chun Rd Zhangjiang Hi Tech Park Pudong New Area Shanghai 201203 Chi...

Reviews: