background image

                CM SUPREME SNNC12' ZZZ-157 MAS-HL.doc       

 

                                                                         

ZZZ-157-MAS-HL

 

 

 

ASSEMBLY INSTRUCTIONS 

1. Assembly of middle arches 

a) Take one arch (07-492); assemble with one main corner arch (07-494) on the left side. 

b) Insert the other corner arch (07-494) on the right side. 

c) Take one completed arch; put screw 1 

¾” (O) through holes 

    on the right side, attach crossbar (06-368) over screw and tighten wing nut (Q). 

d) Repeat same procedures on the left side. 

2. 

Repeat step 1 for the remaining middle arches. 

3. Assembly of end arches (Wing nuts are always on inside) 

a) Take one arch (07-492); assemble with one end corner arch (07-491) on the left side. 

b) Insert the other corner arch (07-491) on the right side. 

c

) Take one completed arch, put 1 ¾” screws (O) through holes on the right side, attach crossbar (06-368)   

    over screw and tighten wind nut (Q). Repeat same procedures on the left side. 

d) Attach one end of door rail (06-373 

– 07-495) to an end arch (07-491) with one screw 1 ¾” (O) and wing nut (Q). 

e) Slide the hooks (M) onto door rail, then 

install free end over screw 1 ¾” (O) and wing nut (Q) and tighten. 

f) Repeat step 3 with the remaining arch. 

g) Place one of the last arches assembled at the front of the shelter, the other at the back. 

 

4. Assembly of legs 

a) Insert (07-489) legs into an end arch one side at a time. 

b) Insert (07-490) legs into a middle arch. 

c) Add middle arch to end arch using connecting pipes (06-371) and (06-374) with screws 3

” (95-270), and 

    install diagonal bar (06-369) with screws 2 ½" (P) and with wing nuts (Q). See sketch at front page. 

    Note: (06-374) should be placed in an end section. 

d) Repeat step b) and c) until the whole shelter is completed. 

e) Make sure the base is open to 143 

¾”

, measured from the exterior of the pipes, in front and back (AC, BD). 

f) Verify that diagonal distances AD and BC are equal, and lengths AB and CD are equal. 

 

5. Cover installation (Ties are always on the inside) 

a) Place the roof in front of the shelter as illustrated. 

b) Unfold as illustrated then lift onto shelter as is. 

c) Place cover over the completed structure making sure that the TRIANGLE 

    is at the front of the garage. 

d) Attach all the straps inside of the roof around the structure poles going completely around the garage.     

e) Tie inside ties firmly to pipes. 

f) Grommets are placed in the upper corner of each door.     

    Put the cord through these grommets and secure to the ground with nails.   

 

6. Door Assembly 

a) Take one door with shiny side facing outside placing on to hooks (M). 

b) Repeat a) for the remaining doors. 

c) Take an elastic, put through one of the grommet holes on the door from the inside 

    out. Take S hook, place it on the elastic and squeeze one end with a pair of pliers so 

    it locks on the elastic. Repeat until all the elastics are done, and then use the open 

    end to hook on the grommet band on the side of the roof. 

 

7. Anchoring garage. 

a) Place your garage in the final position you want then close the front and back doors 

    (if supplied) before anchoring, anchor with brackets (K) and nails (J) as per diagram.   

b) Fix flap to your house (if applicable).   

 

    A

 

    B

 

  C

 

  D

 

    143 ¾”

 

Summary of Contents for NN12X16

Page 1: ...er I N G S 2 2 5 5 D A N D U R A N D S T M O N T E A L Q U E B E C CHER CLIENT Assemblage avec plus qu une personne est sugger Il est conseill de porter des gants lors du montage de la carcasse m tall...

Page 2: ...connection 06 371 et 06 374 et les boulons 3 95 270 et installer la diagonale 06 369 avec le boulon 2 P et une noix papillon Q Voir la page frontale pour le dessin Note 06 374 doit tre plac dans une d...

Page 3: ...our ces c bles guides et ils d pendent du sol sur lequel l abri est install 4 Advenant que le sol ne soit pas gel lors de l installation du produit en plus des crochets de plancher et clous des poids...

Page 4: ...all diagonal bar 06 369 with screws 2 P and with wing nuts Q See sketch at front page Note 06 374 should be placed in an end section d Repeat step b and c until the whole shelter is completed e Make s...

Page 5: ...included They depend on the type of ground the shelter is placed on 4 In the event the ground is not frozen when the product is installed then weights not enclosed of at least 300 lbs per area of 11...

Page 6: ...e 07 495 Rail de porte femelle Female Door rail 1 x48 1 2 11 73 06 373 Rail de porte male Male Door rail 1 x50 3 8 11 72 06 374 Tuyau de Connection Femelle 1 x48 10 49 Female Connecting Pipe J Clous p...

Page 7: ...rovinciale add G S T only les autres ajouter la T P S seulement All merchandise sold F O B shipping point handling Tous nos articles sont vendus F A B notre usine manutention 15 00 minimum or 5 of pur...

Page 8: ...371 Tuyau de Connection Male 1 x50 1 2 15 20 25 35 Male Connecting Pipe 07 495 Rail de porte femelle 1 x48 1 2 2 2 2 2 Female Door rail 06 373 Rail de porte male 1 x50 3 8 2 2 2 2 Male Door rail 06 3...