background image

PRIOR TO INSTALLATION CHECKLIST

IMPORTANT TIPS

This product must be installed by a qualified tradesperson and we would expect the installation to 

be undertaken in a tradesperson like manner and finished to a tradesperson standard. This product 

carries a full warranty against faulty workmanship and materials.  

Please inspect thoroughly before installation to ensure that the product has not been damaged 

and is correct. No claims for damage or incorrect items will be recognised after installation.

 

Check Products For Any Damages

Positioning & Ventilation

Check for Support Beams

Check for Plumb Walls & Level Floors

Check Plumbing Positions Align with Product Interior Configurations. 

Please Note: If you cannot find the installation instructions for your ADP product in this booklet please go to 

www.adpaustralia.com.au/installation-warranty to find applicable instructions.

Within 48 hours of receiving your goods, unpack your ADP 

product and check for any possible freight damages or incorrect 

items.

Please contact your place of purchase to report damages or 

missing parts. 

No claims for damages will be recognised after installation. 

Please note: fixing screws/bolts are not supplied for installation.

Planning your bathroom furniture placement is critical. 

Furniture must be at least 300mm away from any 

wet areas. Materials used in the construction of our 

furntiture units are moisture resistant, not water proof. 

Do not expose furniture to shower spray.

It is important that your bathroom is adequatley  

ventilated to eliminate moisture build up. 

High humidity will lead to permanent dampness and 

mould resulting in a deterioration of the materials in 

your bathroom. 

Wall hung furniture & basins require fixing to a support 

beam fitted between the studs to give a solid wall backing 

to attach the vanity to.  

If necessary, fix additional support noggins at desired height 

for cabinet and basin fixing prior to sheeting the wall. 

Ensure total width of support noggin exceeds vanity width. 

1

2

3

4

5

Ensure the wall is plumb and straight, ensure floor is level. If 

you fix the product to a non-plumb wall or floor the following 

could happen:
• 

Your door or drawers will not operate correctly. 

• 

Door or drawers will not align. 

• 

Basins will not sit level, which may cause water to pool 

or not drain properly.

If it is not possible to make the wall or floor plumb and 

straight you must pack the vanity out so that it does not 

follow the out of aligned wall. 

Floor standing vanities must sit on a level floor or be packed 

so they sit level and true.

Please note

 if your vanity is fixed to a bowed wall, the 

fastening of the fixings will force your cabinet to twist and 

benchtop materials may crack due to increased stress on 

joins and materials. 

Please note

 if your product has any electrical fittings 

please allow for this and talk to your electrician

Take note of clearances behind drawers when  

considering water supply fittings inside cabinet. 

ENSURE ALL TILES EXTEND BEHIND AND BENEATH THE BATHROOM FURNITURE. 

 

ADP do not recommend tiling in furniture due to moisture and mould build up which 
can damage the material and void the warranty.

ALL AREAS WHERE CABINET/TOP MEETS WALL AND/OR FLOOR MUST BE SEALED 
USING A NEUTRAL CURE SILICONE. 

All edges where vanity top meets cabinet, wall or surrounding furniture must also be 

sealed with a continuous bead of silicone.

Ventilation is  

important to  

prevent mould  

& moisture  

build up

300mm 

(minimum clearance)

BATH

IT IS THE RESPONSIBILITY OF THE INSTALLER TO MAKE ANY ADJUSTMENTS TO 

DOORS/DRAWERS AFTER INSTALLATION IF REQUIRED.

IT IS THE RESPONSIBILITY OF THE INSTALLER TO MAKE ANY ADJUSTMENTS TO 

DOORS/DRAWERS AFTER INSTALLATION IF REQUIRED.

There may have been some movement in transportation and installation which causes 

doors/drawers to become unaligned. 

Summary of Contents for ANTONIO METAL FRAME VANITY

Page 1: ...OME OWNER IMPORTANT CARE WARRANTY INFORMATION INSIDE For more information visit www adpaustralia com au ANTONIO METAL FRAME VANITY INSTALLATION INSTRUCTIONS CARE MAINTENANCE PRIOR TO INSTALLATION INSTALLATION INSTRUCTIONS DRAWER ALIGNMENT INSTALLATION CARE MAINTENANCE ADP WARRANTY 2 4 6 7 8 V1 IMPORTANT It is the responsibility of the installer to make any adjustments to doors drawers after instal...

Page 2: ...the vanity to If necessary fix additional support noggins at desired height for cabinet and basin fixing prior to sheeting the wall Ensure total width of support noggin exceeds vanity width 1 2 3 4 5 Ensure the wall is plumb and straight ensure floor is level If you fix the product to a non plumb wall or floor the following could happen Your door or drawers will not operate correctly Door or drawe...

Page 3: ...sition and adjust feet to level vanity Mark position through pre drilled holes in top back rail 4 1 PRE DRILL HOLES Pre drill holes in back rails starting no further than 100mm from each end of the frame and spacing the holes a maximum of 300mm apart Pre drill hole locations into the wall Be sure to use an appropriate drill bit for your wall covering tiles etc Make sure you have drilled into the s...

Page 4: ...scratches marks etc on two pack polyurethane rub gently with car cutting compound car polish or household brass silver cleaner Goods used in construction are water moisture resistant but not water proof All cabinets should be installed at least 300mm away from showers or bathtubs to avoid water damage C E R A M I C B A S I N S A N D T O P S To maintain the finish on your ceramic top use only a sof...

Page 5: ... electrical influences excessive heat damage or Harsh detergents or abrasive cleaners used on product finishes are NOT considered a warranty issue CLAIM PROCEDURE For all warranty queries customers are to contact the branch where the product was purchased These details can be found on your purchase invoice WARRANTY AGREEMENT HOME OWNER TO KEEP Architectural Designer Products Pty Ltd P O Box 1455 U...

Reviews: