Chapter 2. Installation
2-10
TSU 610 User Manual
61200610L2-1
Power-up Testing
When shipped from the factory, the TSU 610 is set to factory
default conditions. At the first application of power, the unit
automatically executes a memory self-test. A full self-test can
be run from the terminal; a passcode and unit ID may be set
using the UTIL menu.
Self-Test
Upon a power-up, the Test LEDs are illuminated and the
following occurs:
The full self-test procedure (invoked from a terminal or
T-Watch Pro) consists of the following tests:
Board level tests
Each of the TSU 610 boards contains an on-board processor
which executes a series of tests checking the circuitry on the
board.
•
RAM and EPROM tests
•
Verify on-board circuitry
Unit level tests
•
Front panel LED verification
•
Board-to-board interface test
A test pattern is sent from the controller through a loopback
on all other boards and checked on the controller. This
verifies the data path, clocks, and control signals for the
entire chassis.
When . . .
Then . . .
the self-test is complete
with no failures detected
the
OK LED
lights up.
a failure is detected
a list of failures is displayed on the
terminal.
Summary of Contents for 1200610L2
Page 20: ...Table of Contents xx TSU 610 User Manual 61200610L2 1...
Page 24: ...List of Tables xxiv TSU 610 User Manual 61200610L2 1...
Page 56: ...Chapter 3 Operation 3 12 TSU 610 User Manual 61200610L2 1...
Page 94: ...Chapter 4 T1 Network Interface 4 38 TSU 610 User Manual 61200610L2 1...
Page 142: ...Appendix B Understanding TR 08 B 4 TSU 610 User Manual 61200610L2 1...
Page 156: ...Appendix E Specifications E 4 TSU 610 User Manual 61200610L2 1...
Page 168: ......