Total Access
®
3000/3010 System Manual
6TADLP726-1E
TOTAL ACCESS 3000/3010
DLP-726
Page 1 of 6
© 2002, ADTRAN, Inc.
Perform Steps Below in the Order Listed
1.1
Verifying the SCU Communication over the X.25
Network
NOTE
References to common, but differing, parameters between the Total Access
3000 and the Total Access 3010, such as number of slots, will be conveyed
by the convention a/b. The “a” represents the Total Access 3000 parameter
and the “b” represents the Total Access 3010 parameter. For example, the
differing number of access slots in the two platforms, 28 for the Total Access
3000 and 22 for the Total Access 3010, would be displayed “28/22.”
1.1.1
Introduction
This procedure details the test steps which must be performed to ensure that the SCU
is communicating properly over the X.25 network.
1.1.2
Prerequisite Procedures
Before beginning this procedure, you should have physically connected the shelf
containing the SCU to the X.25 network (see DLP-714) and completed the
provisioning tasks detailed in DLP-717 for each SCU connected on the RS-485 bus.
1.1.3
Tools and Materials Required
• VT100 Terminal or PC with VT100 Terminal Emulation software
WARNING
To prevent electrical shock, do not install equipment in a wet location or
during a lightning storm.
CAUTION
Electronic modules can be damaged by static electrical discharge. Before
handling modules, wear an antistatic discharge wrist strap to prevent damage
to electronic components. Place modules in antistatic packing material when
transporting or storing. When working on modules, always place them on an
approved antistatic mat that is electrically grounded.