Total Access
®
3000/3010 System Manual
6TADLP744-1E
TOTAL ACCESS 3000/3010
DLP-744
Page 10 of 12
© 2003, ADTRAN, Inc.
Perform Steps Below in the Order Listed
1.3
Completion Checklist
Obtain
NSAP Area Address
and
System ID
for OC-3 L2 MUX (Network
Administrator)
Obtain
Target ID
for Host SCU (Network Administrator)
Mount and power
1 Host Total Access 3000 and 2 Client Total Access 3000
shelves. Each shelf should have:
Host shelf
Chassis (1181001L1)
SCU (1181018L1)
1 or 2 OC-3 L2 MUX (1181031L2)
Quad BNC adapter (1181007L1)
Appropriate line cards for intended service
Client shelf
Chassis (1181001L1)
SCU (1181018L1)
1 or 2 STS-1 L2 MUX (1181030L2)
Dual BNC adapter (1181004L1)
Appropriate line cards for intended service
Connect High Speed
(i.e. coax) cable from Host to Client shelves
Port 1 on Quad BNC connects to Dual BNC on Expansion Shelf #1, Tx to Rx,
Rx to Tx
Port 2 on Quad BNC connects to Dual BNC on Expansion Shelf #2, Tx to Rx,
Rx to Tx
Verify RS-485
connected
P2 “OUT” on Client shelf to P2 “IN” on Expansion Shelf 1. P2 “OUT” on
Expansion Shelf 1 to P2 “IN” on Expansion shelf 2. A to A, B to B,
Drain/Ground to Drain/Ground.
Provision SCU
on Intelligent NE (Host) shelf
SCU/Provisioning/General/Management Ports/Interbank Comm. Mode – Host
SCU/Provisioning/TL1/Target ID – As appropriate designated by Network
Administrator
SCU/Provisioning/TL1/Legacy AID Compatibility – Enable