Total Access
®
3000/3010 System Manual
6TADLP721-1E
TOTAL ACCESS 3000/3010
DLP-721
Page 1 of 4
© 2002, ADTRAN, Inc.
Perform Steps Below in the Order Listed
1.1
Verifying Shelf Wiring to the MDF
NOTE
References to common, but differing, parameters between the Total Access
3000 and the Total Access 3010, such as number of slots, will be conveyed
by the convention a/b. The “a” represents the Total Access 3000 parameter
and the “b” represents the Total Access 3010 parameter. For example, the
differing number of access slots in the two platforms, 28 for the Total Access
3000 and 22 for the Total Access 3010, would be displayed “28/22.”
1.1.1
Introduction
This procedure details the test steps which must be performed to verify that a Total
Access 3000/3010 system has been properly wired to the Main Distribution Frame
(MDF). This procedure should be performed by two people: one at the shelf under test
and the other at the MDF.
1.1.2
Prerequisite Procedures
Before beginning this procedure, you should have completed all installation tasks
involving the connection of the Total Access 3000/3010 shelf to the MDF.
1.1.3
Tools and Materials Required
• Total Access 3000/3010 Test Access Module (TAM) Card
• Test Jack Wire-wrap post slide-on connectors to alligator clips
WARNING
To prevent electrical shock, do not install equipment in a wet location or
during a lightning storm.
CAUTION
Electronic modules can be damaged by static electrical discharge. Before
handling modules, wear an antistatic discharge wrist strap to prevent damage
to electronic components. Place modules in antistatic packing material when
transporting or storing. When working on modules, always place them on an
approved antistatic mat that is electrically grounded.